Contents
Judgment of the Court (Grand Chamber)14 July 2022note(Reference for a preliminary ruling — Approximation of laws — Regulation (EC) No 715/2007 — Approval of motor vehicles — Article 3(10) — Article 5(1) and (2) — Defeat device — Motor vehicles — Diesel engines — Pollutant emissions — Emission control system — Software installed in the electronic engine controller — Exhaust gas recirculation valve (EGR valve) — Reduction in nitrogen oxide (NOx) emissions limited by a temperature window — Prohibition on the use of defeat devices that reduce the effectiveness of emission control systems — Article 5(2)(a) — Exception to that prohibition)In Case C‑128/20,REQUEST for a preliminary ruling under Article 267 TFEU from the Landesgericht Klagenfurt (Regional Court, Klagenfurt, Austria), made by decision of 19 February 2020, received at the Court on the same day, in the proceedingsGSMB Invest GmbH & Co. KGvAuto Krainer GesmbH,THE COURT (Grand Chamber),composed of K. Lenaerts, President, L. Bay Larsen, Vice-President, A. Arabadjiev, A. Prechal, K. Jürimäe, C. Lycourgos, I. Ziemele, Presidents of Chambers, M. Ilešič, J.‑C. Bonichot, F. Biltgen, P.G. Xuereb (Rapporteur), N. Piçarra and N. Wahl, Judges,Advocate General: A. Rantos,Registrar: A. Calot Escobar,having regard to the written procedure,after considering the observations submitted on behalf of:– GSMB Invest GmbH & Co. KG, by T. Kainz, Rechtsanwalt,– Auto Krainer GesmbH, by H. Gärtner, F. Gebert, F. Gonsior, C. Harms, N. Hellermann, F. Kroll, M. Lerbinger, S. Lutz-Bachmann, L.‑K. Mannefeld, K.‑U. Opper, H. Posser, J. Quecke, K. Schramm, W.F. Spieth, J. von Nordheim, K. Vorbeck, B. Wolfers and B. Wollenschläger, Rechtsanwälte,– the German Government, by J. Möller and D. Klebs, acting as Agents,– the European Commission, by M. Huttunen and M. Noll-Ehlers, acting as Agents,after hearing the Opinion of the Advocate General at the sitting on 23 September 2021,gives the following
Judgment
Legal context
European Union law
Regulation No 715/2007
Regulation No 692/2008
Austrian law
The dispute in the main proceedings and the questions referred for a preliminary ruling
Consideration of the questions referred
The first and third questions
The second question
Costs
Operative part
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.