Contents
- Whereas, pursuant to subsection 332(1) of the Canadian Env…
- Purpose and Overview
- Interpretation
- Application
- Responsibility
- Part 1 Upstream Oil and Gas Facilities
- Part 2 [Repealed, SOR/2025-280, s. 15]
- Part 3 Administration
- Consequential Amendment to the Regulations Designating Regulatory Provisions for Purposes of Enforcement (Canadian Environmental Protection Act, 1999)
- Coming into Force
- Schedule 1 Information for Extension of Period for Repair of Equipment Component (Subsection 2(1) and 33(2))
- Schedule 2 Information for Permit for Pneumatic Pumps (Subsection 40(2))
- Schedule 3 Information for Registration of a Facility (Subsections 54(1) and (3))
- Amendments not in force
Whereas, pursuant to subsection 332(1) of the Canadian Environmental Protection Act, 1999, the Minister of the Environment published in the Canada Gazette, Part I, on May 27, 2017, a copy of the proposed Regulations Respecting Reduction in the Release of Methane and Certain Volatile Organic Compounds (Upstream Oil and Gas Sector), substantially in the annexed form, and persons were given an opportunity to file comments with respect to the proposed Regulations or to file a notice of objection requesting that a board of review be established and stating the reasons for the objection;Whereas, pursuant to subsection 93(3) of that Act, the National Advisory Committee has been given an opportunity to provide its advice under section 6 of that Act;And whereas, in accordance with subsection 93(4) of that Act, the Governor in Council is of the opinion that the proposed Regulations do not regulate an aspect of a substance that is regulated by or under any other Act of Parliament in a manner that provides, in the opinion of the Governor in Council, sufficient protection to the environment and human health;Therefore, Her Excellency the Governor General in Council, on the recommendation of the Minister of the Environment and the Minister of Health, pursuant to subsection 93(1), section 286.1 and subsection 330(3.2) of the Canadian Environmental Protection Act, 1999, makes the annexed Regulations Respecting Reduction in the Release of Methane and Certain Volatile Organic Compounds (Upstream Oil and Gas Sector).notenotenotenotenote
Purpose and Overview
1Protection of environment and reduction of harmful effects#
Interpretation
2Definitions#
Application
Responsibility
3Operator#
Part 1 · Upstream Oil and Gas Facilities
General Requirements
Hydrocarbon Gas Conservation and Destruction Equipment
5Hydrocarbon gas conservation equipment#
6Records — conservation equipment#
7Conserved gas — use#
8Records — conserved gas used as fuel#
9Hydrocarbon gas destruction equipment#
10Records — hydrocarbon gas destruction equipment#
Well Completion involving Hydraulic Fracturing
11Application#
12Records — hydraulic fracturing#
13Non-application — British Columbia and Alberta#
Compressors
14Capture or venting of emissions#
15Measurement of flow rate#
16Flow meters#
17Continuous monitoring devices#
18Corrective action#
19Records — compressors and vents#
Conditional Requirements
Conditions
20Application of sections 26 to 45#
21Records — non-application#
22Records — application#
Determination of Volume of Gas
23Applicable methods#
24Determination of gas-to-oil ratio#
25Records#
Venting Limit
2615 000 standard m3 per year#
27Records — volumes of hydrocarbon gas#
Leak Detection and Repair Program
Establishment of Program
28Non-application to certain equipment components#
29Regulatory or alternative LDAR programs#
Regulatory LDAR Programs
30Obligation to inspect#
31Leaks#
32Period for repair#
33Extension up to six months for repair#
34Revocation of extension#
Alternative LDAR Programs
35Requirements for alternative program#
Records
36Regulatory LDAR programs#
Pneumatic Controllers and Pneumatic Pumps
37Pneumatic controllers — bleed rate#
38Records — pneumatic controllers#
39Pneumatic pumps#
40Permit — pneumatic pumps#
41Tagging#
Other Equipment
42Pipes and hatches#
43Sampling systems and pressure relief devices#
44Records — hatches, pipes, systems and devices#
Revocation of Permit
45Subsection 40(2)#
Part 2 · [Repealed, SOR/2025-280, s. 15]
Part 3 · Administration
Registration
54Registration report#
55Provision of information#
Record-making and Updating and Keeping of Documents
56Record-making and updates#
Consequential Amendment to the Regulations Designating Regulatory Provisions for Purposes of Enforcement (Canadian Environmental Protection Act, 1999)
Coming into Force
58January 1, 2020#
Schedule 1 · Information for Extension of Period for Repair of Equipment Component (Subsection 2(1) and 33(2))
1 The name and civic address of the operator.2 The name, job title, civic and postal addresses, telephone number and email address of the operator’s authorized official.3 The name, job title, civic and postal addresses, telephone number and email address of a contact person, if different from the authorized official.4 The name of the facility and the federal and provincial identification numbers for the facility, if any, and its civic address or, if the civic address is not available,(a) its latitude and longitude to the third decimal place;(b) its location expressed to the nearest unit of the National Topographic System produced by the Department of Natural Resources; or(c) the legal subdivision within which the facility is located, if it is located in Manitoba, Saskatchewan or Alberta.5 The date on which the next planned shutdown of the facility is to end.6 The following information in respect of the equipment component for which the extension to the period by which it must be repaired is applied for:(a) the identifier for the equipment component, along with its make and model, if that information is available;(b) the name of its manufacturer, along with the manufacturing location;(c) a description of the equipment component, including an explanation of its functions within the production processes of the facility and how those functions are carried out; and(d) any other information that is relevant to determine whether it is technically feasible to complete the repair of the equipment component before the end of the next planned shutdown.
Schedule 2 · Information for Permit for Pneumatic Pumps (Subsection 40(2))
1 The name and civic address of the operator.2 The name, job title, civic and postal addresses, telephone number and email address of the operator’s authorized official.3 The name, job title, civic and postal addresses, telephone number and email address of a contact person, if different from the authorized official.4 The name of the facility and the federal and provincial identification numbers for the facility, if any, and its civic address or, if the civic address is not available,(a) its latitude and longitude to the third decimal place;(b) its location expressed to the nearest unit of the National Topographic System produced by the Department of Natural Resources; or(c) the legal subdivision within which the facility is located, if it is located in Manitoba, Saskatchewan or Alberta.5 The identifier for the pneumatic pump, along with its make and model and the name of its manufacturer, if that information is available.
Schedule 3 · Information for Registration of a Facility (Subsections 54(1) and (3))
1 The name and civic address of the operator.2 The name, job title, civic and postal addresses, telephone number and email address of the operator’s authorized official.3 The name, job title, civic and postal addresses, telephone number and email address of a contact person, if different from the authorized official.4 The name of the facility, all provincial identification numbers that are related to the facility and used for reporting to provincial authorities, along with the facility’s civic address or, if the civic address is not available,(a) its latitude and longitude to the third decimal place;(b) its location expressed to the nearest unit of the National Topographic System produced by the Department of Natural Resources; or(c) the legal subdivision within which the facility is located, if it is located in Manitoba, Saskatchewan or Alberta.5 If records, along with supporting documents, that are required to be made under these Regulations are not kept at the upstream oil and gas facility to which they relate, the civic address of the place where they are kept or, if the civic address is not available(a) its latitude and longitude to the third decimal place;(b) its location expressed to the nearest unit of the National Topographic System produced by the Department of Natural Resources; or(c) the legal subdivision within which the facility is located, if it is located in Manitoba, Saskatchewan or Alberta.6 For a facility that provides information to the Minister for its registration report by way of an approved entity, an indication of any type or subtype of the facility that is used by the entity for the purpose of classifying the facility.
Amendments not in force
— SOR/2025-280, ss. 1(1), (2), (4) and (5)The definitions completion, design bleed rate, flowback, gas-to-oil ratio, hydraulic fracturing, pneumatic controller and pneumatic pump in subsection 2(1) of the Regulations Respecting Reduction in the Release of Methane and Certain Volatile Organic Compounds (Upstream Oil and Gas Sector) are repealed.noteThe definition fugitive in subsection 2(1) of the Regulations is repealed.The portion of the definition venting in subsection 2(1) of the English version of the Regulations before paragraph (a) is replaced by the following:venting means the emission of hydrocarbon gas from an upstream oil and gas facility in a controlled manner, other than the emission of gas arising from combustion, due toSubsection 2(1) of the Regulations is amended by adding the following in alphabetical order:emission monitoring system means a system consisting of one or more sensors and other equipment that is designed to monitor hydrocarbon gas emissions at an upstream oil and gas facility. (système de mesure et d’enregistrement des émissions)engineer means a person who is registered or licensed to engage in the practice of engineering under the laws of the province in which they practise. (ingénieur)facility emission intensity, in respect of an upstream oil and gas facility, means the ratio, expressed in percent, that is calculated by dividing the total volume of hydrocarbon gas emissions from the facility in the 365-day period preceding the day on which the calculation is made by the greatest of the following volumes:the volume of hydrocarbon gas produced at the facility during that period,the volume of hydrocarbon gas processed at the facility during that period, andthe volume of hydrocarbon gas that is equal to the volume of hydrocarbon gas transported from the facility during that period minus the sum of the volumes of hydrocarbon gas referred to in paragraphs (a) and (b). (intensité d’émission)facility emission rate meansin respect of an inactive facility, a rate of 0 kg/h; andin respect of any other upstream oil and gas facility, the total volume of hydrocarbon gas emissions from the facility, expressed in kg/h, referred to in the definition facility emission intensity. (seuil du taux d’émission)facility emission reference standard meansin respect of an inactive facility, 0%; andin respect of any other upstream oil and gas facility, one of the following values:0.2%, if, during the 365-day period referred to in the definition facility emission intensity, the volume of hydrocarbon gas produced at the facility is greater than the volume of hydrocarbon gas processed at the facility and the volume of hydrocarbon gas transported from, but not produced or processed at, the facility, respectively,0.05%, if, during the 365-day period referred to in the definition facility emission intensity, the volume of hydrocarbon gas processed at the facility is greater than the volume of hydrocarbon gas produced at the facility and the volume of hydrocarbon gas transported from, but not produced or processed at, the facility, respectively,0.11%, if, during the 365-day period referred to in the definition facility emission intensity, the volume of hydrocarbon gas transported from, but not produced or processed at, the facility is greater than the volume of hydrocarbon gas produced at the facility and the volume of hydrocarbon gas processed at the facility, respectively. (étalon de référence)fugitive emission means an unintentional emission of hydrocarbon gas from an upstream oil and gas facility. (émission fugitive)inactive facility means a Type 1 facility or Type 2 facility at which hydrocarbon is not produced, processed or transported and at which those activities have not occurred in respect of hydrocarbon in the previous 365 days. (installation inactive)Type 1 facility means an upstream oil and gas facility at which any of the following equipment is installed:a natural gas compressor;a storage tank for hydrocarbon liquid that is produced at the facility; ora permanent flare. (installation de type 1)Type 2 facility means an upstream oil and gas facility other than a Type 1 facility. (installation de type 2) — SOR/2025-280, s. 3The Regulations are amended by adding the following after section 2.1:Part 1 does not apply to an upstream oil and gas facility to which Part 2 applies.If the operator of an upstream oil and gas facility provides the Minister with notice of the use of an emission monitoring system at the facility in accordance with section 2.3, Part 2 applies in respect of that facility beginning on the day specified in the notice.If the operator of an upstream oil and gas facility provides the Minister with notice of the discontinuance of use of the emission monitoring system at the facility in accordance with section 2.4, Part 2 ceases to apply to that facility beginning on the day specified in the notice.The notice referred to in subsection 2.2(2) must not be provided in respect of an upstream oil and gas facility unless its facility emission intensity, as calculated by an engineer, is less than its facility emission reference standard.However, if the facility has been in operation for less than 365 days, the notice may be provided if an engineer estimates that, after the facility has been in operation for 365 days, its facility emission intensity will be less than its facility emission reference standard.The notice must be in writing, specify the day on which use of the emission monitoring system is to begin at the facility and contain the following information and documents:the name of the facility and its civic address or, if the civic address is not available,its latitude and longitude to the third decimal place,its location expressed to the nearest unit of the National Topographic System produced by the Department of Natural Resources, orif the facility is located in Manitoba, Saskatchewan or Alberta, the legal subdivision within which it is located;its facility emission intensity and the date of its calculation;its facility emission rate and the date of its determination;the volumes of hydrocarbon gas produced at, processed at and transported from the facility, respectively, during the period used to calculate the facility emission intensity referred in paragraph (b);a description of the sensors and other equipment that constitute the emission monitoring system, including their specifications and datasheets;an attestation, signed and dated by an engineer, indicating that the emission monitoring system meets the requirements set out in section 53; andthe name, address and contact information of the engineer who signed the attestation.Despite paragraphs (3)(b) to (d), if the facility has been in operation for less than 365 days, the notice must contain estimates — prepared by an engineer — of the information referred to in those paragraphs.The notice must be provided to the Minister at least 60 days before the day specified in the notice, unless it is provided before March 1, 2028.The notice referred to in subsection 2.2(3) must be in writing, specify the day on which use of the emission monitoring system is to be discontinued at the upstream oil and gas facility and be provided to the Minister at least 60 days before the specified day. — SOR/2025-280, s. 5The heading “Hydrocarbon Gas Conservation and Destruction Equipment” before section 5 of the Regulations is replaced by the following:Hydrocarbon Gas Conservation Equipment — SOR/2025-280, s. 6The Regulations are amended by adding the following after section 8:Detection of Fugitive Emissions and Repair ProgramSubject to subsections (2) and (3) and section 8.14, a comprehensive inspection for fugitive emissions at an upstream oil and gas facility must be conductedin the case of a Type 1 facility, once in each quarter of the calendar year, at least 60 days after the date of the most recent comprehensive inspection; andin the case of a Type 2 facility, once per calendar year, at least 270 days after the date of the most recent comprehensive inspection.Subsection (1) does not apply in respect ofan inactive facility; andan upstream oil and gas facility that begins operations before January 1, 2028, at which crude oil is produced and at which during the previous calendar yearthe volume of crude oil produced did not exceed 600 m3, andthe combined volume of hydrocarbon gas produced and received did not exceed 12 000 m3.A comprehensive inspection is not required to be conducted at a Type 1 facility in a quarter of the calendar year if, on the day before the scheduled day of the inspection in that quarter, the temperature at the facility’s location is forecast to be below -20°C on that scheduled day.A comprehensive inspection must be conducted using an optical gas-imaging instrument that meets the requirements of subsection (5) or any other instrument that meets the requirements of subsection (6).If a comprehensive inspection is conducted using an optical gas-imaging instrument, the instrument mustbe capable of imaging gas that isin the spectral range for the compound of highest concentration in the hydrocarbon gas to be measured, andcomposed of half methane and half propane at a total concentration of 500 ppmv or at a flow rate of 60 g/h when it is leaking from an orifice that is 0.635 cm in diameter; andbe operated and maintained in accordance with the manufacturer’s recommendations or, if they are not available, industry standards and best practices.If a comprehensive inspection is conducted using an instrument other than an optical gas-imaging instrument, the instrument mustbe capable of measuring 500 ppmv of hydrocarbon;have a scale that is readable to ±12.5 ppmv of hydrocarbon; andbe operated and maintained in accordance with the manufacturer’s recommendations or, if they are not available, industry standards and best practices.Subject to subsection (2) and section 8.14, a screening inspection for fugitive emissions at an upstream oil and gas facility must be conducted once in each month in which the operator or a representative of the operator visits the facility.A screening inspection is not required to be conducted in any of the following months:a month in which a comprehensive inspection is conducted at the facility;a month in which, on the day before the scheduled day of the screening inspection, the temperature at the facility’s location is forecast to be below -20°C on that scheduled day.A screening inspection must be conducted using a monitoring instrument that, when operated in accordance with the manufacturer’s recommendations, is capable of detecting a fugitive emission with a flow rate of 10 kg/h or more.Subject to subsection (3) and section 8.14, an annual inspection for fugitive emissions at an upstream oil and gas facility must be conducted by an auditor whois independent of the operator and owner of the facility that is to be inspected; andhas knowledge of and experience with emission detection instruments.The annual inspection must be conducted in each calendar year at least 180 days after the date of the most recent annual inspection and at least 30 days after the date of the most recent comprehensive inspection.An annual inspection is not required to be conducted in any calendar year in which an annual inspection is conducted at the upstream oil and gas facility under subsection 53.1(1).An annual inspection must be conducted using a method that, under standard conditions, provides a 90% or greater probability of detecting a fugitive emission that has a flow rate of 10 kg/h or more.An inspection required under any of sections 8.1 to 8.12 must be conductedby a person who, not more than five years before the day on which the inspection occurs, has received training in the calibration, maintenance and operation of the instruments that are used to conduct the inspection; andusing instruments that are calibrated, maintained and operated in accordance with the manufacturer’s recommendations, if any.An inspection required under any of sections 8.1 to 8.12 is not required to include the inspection of an equipment component if that inspection would pose a serious risk to human health or safety.When a fugitive emission is detected at an upstream oil and gas facility, whether as a result of an inspection or otherwise, the equipment component that is emitting the hydrocarbon gas must be repairedif the repair can be carried out while the equipment component is operating, within the applicable period referred to in subsection (2) or (3); andin any other case, before the end of the next planned shutdown of the facility.If the equipment component can be repaired while it is operating and the flow rate of the fugitive emission is not determined, the component must be repaired within 24 hours after the emission is detected.If the equipment component can be repaired while it is operating and the flow rate of the fugitive emission is determined, the component must be repairedin the case of a flow rate that is less than 1 kg/h, within 90 days after the day on which the emission is detected;in the case of a flow rate that is 1 kg/h or more but less than 10 kg/h, within 30 days after the day on which the emission is detected;in the case of a flow rate that is 10 kg/h or more but less than 100 kg/h, within seven days after the day on which the emission is detected; andin the case of a flow rate that is 100 kg/h or more, within 24 hours after the emission is detected.However, if a measure is taken that reduces the flow rate of the fugitive emission to less than 10 kg/h during the applicable repair period referred to in paragraph (3)(c) or (d), the repair must be completed within 30 days after the day on which the emission is detected.In subsections (6) and (7), a reference to a volume of hydrocarbon gas is a reference to that volume expressed in standard m3.Despite paragraphs (3)(a) and (b) and subsection (4), if the equipment component is emitting hydrocarbon gas at a flow rate of less than 10 kg/h, the repair of the equipment component may be deferred until the day on which the estimated total volume of fugitive emissions that, beginning on the day on which the fugitive emission is detected, would be emitted from that equipment component and from all other equipment components as of that day is equal to the volume of hydrocarbon gas that, if none of those equipment components were repaired, would be emitted during a temporary depressurization of the equipment or a pipeline conducted in order to carry out the repair.If the equipment component cannot be repaired while it is operating, the next planned shutdown of the upstream oil and gas facility must be scheduled no later than the day on which the estimated total volume of fugitive emissions that, beginning on the day on which the fugitive emission is detected, would be emitted from that equipment component and from all other equipment components as of that day is equal to the volume of hydrocarbon gas that, if none of those equipment components were repaired, would be emitted during a temporary depressurization of the equipment or a pipeline conducted in order to carry out the repair.An equipment component is considered to be repaired when the fugitive emission is no longer detectable using a method that is capable of detecting hydrocarbon gas at a flow rate of 60 g/h or less or at a concentration of 500 ppmv or less.The operator of an upstream oil and gas facility may apply to the Minister to extend the repair period referred to in paragraph 8.15(3)(a) or (b) or subsection 8.15(4) or, in the case where the repair has been deferred in accordance with subsection 8.15(6), to extend the period to complete the repair, ifthey make the application at least 15 days before the day on which the repair period ends or the day to which the repair has been deferred, as the case may be; andthe equipment component is emitting hydrocarbon gas at a flow rate of less than 10 kg/h.The operator of an upstream oil and gas facility may apply to the Minister to defer the scheduled day of the next planned shutdown of the facility determined in accordance with subsection 8.15(7) if they make the application at least 15 days before that scheduled day.An application made under subsection (1) or (2) must contain the information referred to in Schedule 1 and the following information and documents:in the case of an application made under subsection (1), documents that establish that, as of the making of the application, there are reasonable grounds to conclude that it is not technically feasible for the operator to complete the repair of the equipment component before the end of the applicable repair period or the day to which the repair has been deferred, as the case may be;in the case of an application made under subsection (2), documents that establish that, as of the making of the application, there are reasonable grounds to conclude that it is not technically feasible for the operator to complete the repair of the equipment component before the end of the next planned shutdown of the upstream oil and gas facility;documents that establish that the operator has a plan to repair the equipment component that sets outthe expected date for the completion of the repair,the measures to be taken to ensure completion of the repair on or before that date,a justification, with supporting documents, for the belief as to why that date is the earliest feasible date to complete the repair, andthe measures to be taken to minimize, if not eliminate, any harmful effect on the environment or human health and safety from the emission of hydrocarbon gas before the completion of the repair; anda statement that the implementation of the plan is to begin within 30 days after the day on which the extension or deferral is granted.If the application contains the information and documents referred to in subsection (3), the Minister mustin the case of an application referred to in subsection (1), extend the repair period or the period of time to complete the repair, as the case may be, for a period of no more than six months; andin the case of an application referred to in subsection (2), defer the scheduled day of the next planned shutdown for a period of no more than six months.The Minister must renew an extension or deferral granted under subsection (4) ifthe operator provides the Minister with a renewal application that contains the information referred to in Schedule 1 and the following information and documents:the information referred to in paragraphs (3)(c) and (d),in the case of an application to renew an extension granted under paragraph (4)(a), documents that establish that, as of the making of the application, there are reasonable grounds to conclude that it is not technically feasible for the operator to complete the repair of the equipment component before the day on which the extended repair period ends or the additional time to complete the repair ends, as the case may be, andin the case of an application to renew a deferral granted under paragraph (4)(b), documents that establish that, as of the making of the application, there are reasonable grounds to conclude that it is not technically feasible for the operator to complete the repair of the equipment component before the day to which the next planned shutdown of the upstream oil and gas facility was deferred;the application is providedin the case of an application to renew an extension referred to in paragraph (4)(a), no later than 45 days before the day on which the extended repair period ends or the additional time to complete the repair ends, as the case may be, andin the case of an application to renew a deferral referred to in paragraph (4)(b), no later than 45 days before the day to which the planned shutdown of the upstream oil and gas facility was deferred; andthe extension or deferral, as the case may be, has not been previously renewed.The Minister must refuse to grant an application referred to in this section if the Minister has reasonable grounds to believe that the operator has provided false or misleading information in the application.The Minister must revoke an extension or deferral granted under subsection 8.16(4) or renewed under subsection 8.16(5) if the Minister has reasonable grounds to believe that the operator has provided false or misleading information in their application.However, the Minister must not revoke the extension or deferral unless the Minister has provided the operator withwritten reasons for the proposed revocation; andan opportunity to be heard, by written representation, in respect of the proposed revocation.A record must be made that sets out the following information respecting the inspections and fugitive emissions at an upstream oil and gas facility:for each inspection,its date and time,whether it was a comprehensive inspection, a screening inspection or an annual inspection,the methodology used,the make and model number of each instrument used,information respecting the calibration of each instrument used, andwhether a fugitive emission was detected;the name and contact information of the auditor who conducted the annual inspection, along with the name and business address of their employer;for each person who conducted a comprehensive or screening inspection,their name and contact information and the name and business address of their employer, if their employer is not the operator,the dates on which they received training and, for each of those dates, the number of hours of training, anda description of the training received;if, in accordance with paragraph 8.1(2)(b), a comprehensive inspection was not carried out at the facilitythe volume, expressed in m3, of crude oil produced at the facility in the previous calendar year, andthe combined volume, expressed in m3, of hydrocarbon gas produced and received at the facility in the previous calendar year;if, in accordance with subsection 8.1(3) or paragraph 8.11(2)(b), a comprehensive inspection or screening inspection was not carried out at the facility, the temperature that, on the day before the scheduled day of the inspection, was forecasted for the facility’s location on that scheduled day; andfor each fugitive emission detected,the unique identifier, if any, assigned to the emission by the operator,a description of the equipment component that emitted the hydrocarbon gas and the location of that equipment component,the date on which the emission was detected,the date on which the emission ended,the flow rate, expressed in kg/h, of the emission before repair of the equipment component, if determined,if the equipment component cannot be repaired while it is operating, the day of the next planned shutdown of the facility and the calculations that support scheduling the shutdown on that day,if a measure referred to in subsection 8.15(4) is taken to reduce the flow rate of the emission to less than 10 kg/h, the flow rate of the emission, expressed in kg/h, after that measure was taken,if the repair of the equipment component was deferred in accordance with subsection 8.15(6), the calculations that were used to identify the date until which the repair can be deferred, andfor each equipment component that is repaired, the method that was used to verify the repair. — SOR/2025-280, s. 7Sections 9 to 19 and the headings before section 20 of the Regulations are repealed. — SOR/2025-280, s. 8The portion of subsection 20(1) of the Regulations before paragraph (a) is replaced by the following:Sections 26, 27 and 37 to 45 apply in respect of an upstream oil and gas facility as of the first day of the month that begins after the facility produces or receives, or is expected to produce or receive, a combined volume of more than 60 000 standard m3 of hydrocarbon gas for a period of 12 months, determined as follows:Section 20 of the Regulations is repealed. — SOR/2025-280, s. 9The portion of section 21 of the Regulations before paragraph (a) is replaced by the following:If, for a given month, none of sections 26, 27 and 37 to 45 apply in respect of an upstream oil and gas facility, a record, with supporting documents, must be made that indicatesSection 21 of the Regulations is repealed. — SOR/2025-280, s. 10Sections 22 to 27 of the Regulations are repealed. — SOR/2025-280, s. 11The headings before section 28 and sections 28 to 36 of the Regulations are repealed. — SOR/2025-280, s. 12The heading before section 37 and sections 37 to 45 of the Regulations are repealed. — SOR/2025-280, s. 13The Regulations are amended by adding the following after section 45:Hydrocarbon Gas Destruction and VentingApplicationSections 46 to 50 apply in respect of an upstream oil and gas facilityif operations at the facility begin before January 1, 2028, as of January 1, 2030; andif operations at the facility begin on or after January 1, 2028, as of the day on which it begins operations. — SOR/2025-280, s. 14Section 45.1 of the Regulations and the heading “Application” before it are repealed. — SOR/2025-280, s. 16The Regulations are amended by adding the following after section 45.1:Hydrocarbon Gas DestructionThe destruction of hydrocarbon gas at an upstream oil and gas facility, other than destruction that is necessary to avoid serious risk to human health or safety arising from an emergency situation, must be supported by an engineering study that concludes that use of the hydrocarbon gas to produce useful heat or energy is not feasible in the circumstances.The engineering study must be reassessed every 12 months by an engineer and if the conclusion referred to in subsection (1) can no longer be supported, the destruction of hydrocarbon gas at the facility must cease.Hydrocarbon gas destruction equipment, other than a catalytic oxidation system, that is used at an upstream oil and gas facility musthave a combustion system that, when hydrocarbon gas is routed to that system,maintains the stable combustion of hydrocarbon gas without generating any visible emission, andhas a carbon conversion efficiency of at least 98%; andbe operated and maintained in accordance with the manufacturer’s recommendations or, if they are not available, industry standards and best practices.If the combustion system referred to in paragraph (1)(a) does not have an automatic flame failure detection system, the hydrocarbon gas destruction equipment must be visually inspected at least once every seven days to ensure that stable combustion of hydrocarbon gas is being maintained.A catalytic oxidation system that is used at an upstream oil and gas facility for the purpose of hydrocarbon gas destruction mustbe operated such that hydrocarbon gas is not routed to the system when the catalyst temperature is below that recommended by the equipment manufacturer; andbe operated and maintained in accordance with the manufacturer’s recommendations.If destruction of hydrocarbon gas occurs at an upstream oil and gas facility, a record must be made that containsa copy of the engineering study referred to in subsection 46(1); andas applicable, a copy of the conclusions of any reassessment of that study performed in accordance with subsection 46(2).The following records must be made respecting the hydrocarbon gas destruction equipment that is located at the facility:a record that indicates whether the equipment consists of a combustion system or catalytic oxidation system;in the case where the equipment consists of a combustion system,a record that indicates whether it has an automatic flame failure detection system and how the flame will be relit if it fails, andif the combustion system does not have an automatic flame failure detection system, a record of each visual inspection performed in accordance with subsection 47(2); anda record that indicates how the equipment meets the requirements of subsection 47(1) or (3), as applicable, and that contains a description of how the equipment is operated and maintained, including the manufacturer’s recommendations — or, if they are not available — a list of the industry standards and best practices for its operation and maintenance.VentingSubject to subsection (2), hydrocarbon gas must not be vented from an upstream oil and gas facility.Hydrocarbon gas may be vented from the facility ifit is vented as part of planned equipment maintenance or a planned temporary depressurization of equipment or a pipeline and measures are taken to minimize the volume of hydrocarbon gas that is vented;it is necessary to avoid serious risk to human health or safety arising from an emergency situation;the heating value of the hydrocarbon gas or its flow rate are insufficient to sustain continuous destruction of the gas by hydrocarbon gas destruction equipment;the use of hydrocarbon gas destruction equipment or hydrocarbon gas conservation equipment would prolong an interruption of the hydrocarbon gas supply to the public; orcrude oil is produced at the facility andoperations at the facility began before January 1, 2028,in the calendar year before the one in which the venting is to occur, the volume of crude oil produced at the facility did not exceed 600 m3 and the total volume of hydrocarbon gas vented from the facility did not exceed 12 000 m3,the venting is not from a pneumatic device that uses pressurized gas to generate mechanical energy, andmeasures are taken to minimize the volume of hydrocarbon gas that is vented, such as the conservation or destruction of the gas.Despite subsection (2), no more than 12 000 m3 of hydrocarbon gas may be vented in a calendar year from an upstream oil and gas facility referred to in paragraph (2)(e).A record must be made that sets out the following information respecting the venting of hydrocarbon gas from an upstream oil and gas facility:for each instance of venting referred to in paragraphs 49(2)(a) to (d),the date, time and duration of the venting,identification of the equipment component that is the source of the venting,the flow rate of the vented hydrocarbon gas, expressed in kg/h, under standard conditions,a description of the circumstances leading up to the venting and the reasons for it, including identification of the exception referred to in subsection 49(2) that is to be relied on and an explanation of why it is applicable in the circumstances, andthe measures that were taken to minimize the volume of the vented hydrocarbon gas; andin respect of venting referred to in paragraph 49(2)(e),the volume of crude oil, expressed in m3, that was produced at the facility in the previous calendar year,the volume of hydrocarbon gas, expressed in m3, that was vented from facility in the previous calendar year, andthe measures that were taken to minimize the volume of vented hydrocarbon gas.Upstream Oil and Gas Facilities Using an Emission Monitoring SystemSystem OperationAfter providing the notice referred to in subsection 2.2(2), the operator must ensure that the facility emission intensity for the upstream oil and gas facility, as calculated by an engineer, remains less than its facility emission reference standard.The facility emission intensity and facility emission rate for the facility must be updated annually and aftereach analysis that is conducted under subsection 53.2(2); andany physical change to the facility or change to its operation that would affect, by 10% or more, the volume of the facility’s hydrocarbon gas emissions or the volume of hydrocarbon gas that is produced or processed at the facility or transported from it.A facility emission rate that is updated, including in accordance with subsection (2), must be adjusted to include any change in the volume of hydrocarbon gas emissions from the facility, expressed in kg/h, that an engineer estimates will occur in the 365-day period following a physical change to the facility or a change to its operation that has occurred since the day on which the rate was last determined.A record must be made that sets out the following information:the facility emission intensity and facility emission rate for the upstream oil and gas facility on the day specified in the notice provided under subsection 2.2(2); andeach update to its facility emission intensity and facility emission rate, the date of the update and the reason for it.An emission monitoring system must be operating at all times, except for any period during which all or part of the system is undergoing preventive maintenance.The preventive maintenance must not be performed during any period in which an emission of hydrocarbon gas is planned or expected to occur at the upstream oil and gas facility.System RequirementsAn emission monitoring system must meet the following requirements:its sensors and other equipment mustbe capable, under controlled laboratory conditions, of detecting hydrocarbon gas emissions that have a total flow rate of 1 kg/h or more, andbe placed at locations where they can detect hydrocarbon gas emissions at the facility;its sensors must take readingsin the case of a Type 1 facility, at least once every 15 minutes, andin the case of a Type 2 facility or an inactive facility, at least once every 12 hours;it must record each reading taken under paragraph (b); andit must generate an alert when the total flow rate of hydrocarbon gas emissions detected at the facility exceeds the facility emission rate by 1 kg/h or more.All sensors and other equipment that constitute the emission monitoring system must be calibrated in accordance with the manufacturer’s recommendations such that their measurements have a maximum margin of error of ±20%.InspectionSubject to subsections (2) and (3), an annual inspection for hydrocarbon gas emissions at an upstream oil and gas facility must be conducted once per calendar year, with no less than 180 days having elapsed since the date of the last annual inspection, by an auditor whois independent of the operator and owner of the facility that is to be inspected; andhas knowledge of and experience with emission detection instruments.An annual inspection is not required to be conducted at the upstream oil and gas facility in any calendar year in which an annual inspection is conducted at the facility under subsection 8.12(1).An annual inspection is not required to include the inspection of an equipment component if that inspection would pose a serious risk to human health or safety.An annual inspection must be conducted using methods that, under standard conditions, provide a 90% or greater probability of detecting hydrocarbon gas emissions at the facility that have a total flow rate of 10 kg/h or more.A record must be made that sets out the following information respecting each annual inspection:its date and time;the name and contact information of the auditor who conducted the inspection, along with the name and business address of their employer;a description of the methodology and equipment used;information respecting the calibration of each instrument used;whether hydrocarbon gas emissions were detected; andif hydrocarbon gas emissions were detected,their total flow rate, expressed in kg/h,the unique identifier, if any, assigned to those emissions by the operator, anda list of the measures that were taken to reduce those emissions, if any.EmissionsIf the total flow rate of hydrocarbon gas emissions detected at an upstream oil and gas facility is higher than its facility emission rate by 1 kg/h or more, the total flow rate must be reduced to less than 1 kg/h above the facility emission rate as soon as feasible, but in any case, by no later thanif the total flow rate is higher than the facility emission rate by 1 kg/h or more, but less than 10 kg/h higher than that rate, 30 days after the day on which the emissions are detected;if the total flow rate is higher than the facility emission rate by 10 kg/h or more but less than 100 kg/h higher than that rate, seven days after the day on which the emissions are detected; andif the total flow rate is higher than the facility emission rate by 100 kg/h or more, 24 hours after the emissions are detected.An analysis must be conducted in respect of each instance when the total flow rate of the hydrocarbon gas emissions detected at the upstream oil and gas facility is higher than its facility emission rate by 10 kg/h or more.A record must be made that sets out the following information:the date, time and duration of each instance when the emission monitoring system is not in operation;for each instance when the total flow rate of hydrocarbon gas emissions at the upstream oil and gas facility was higher than its facility emission rate by 1 kg/h or more,the maximum total flow rate of the emissions, expressed in kg/h, if known,the date and time when the emissions were detected,the date and time when the total flow rate of the emissions was reduced to less than 1 kg/h above the facility emission rate,a list of the measures that were taken to reduce the total flow rate of the emissions, andthe period, if any, during which the facility was shut down; andthe results of each analysis conducted under subsection (2).Annual ReportOn or before June 30 in each year, an annual report must be provided to the Minister that contains the following information and documents in respect of the upstream oil and gas facility for the preceding calendar year:with respect to the annual inspection of the facility,as applicable, a copy of the record referred to in subsection 53.1(5) or a copy of the information referred to in paragraphs 8.18(a), (b) and (f), andevery reading of the total flow rate of hydrocarbon gas emissions at the facility that was taken and recorded by the emission monitoring system during the annual inspection;the information referred to in paragraphs 53.2(3)(b) and (c) respecting the total flow rate of hydrocarbon gas emissions during the calendar year at the facility;each update to its facility emission intensity and facility emission rate, the calculations that support the update, the date of the update and the reason for it; andthe last facility emission intensity and facility emission rate calculated in the calendar year preceding the calendar year for which the report is provided. — SOR/2025-280, s. 17Subsections 54(1) and (2) of the Regulations are replaced by the following:An upstream oil and gas facility must be registered by providing a registration report for the facility to the Minister that contains the information referred to in Schedule 3.The facility must be registered not later than 120 days after the later of January 1, 2028 and the day on which operations at the facility begin. — SOR/2025-280, s. 18The Regulations are amended by adding the following after section 55:Supplementary NoticeIf an upstream oil and gas facility is registered in accordance with subsection 54(1) before January 1, 2028, a supplementary notice that contains the information referred to in item 7 of Schedule 3 must be provided to the Minister by no later than April 30, 2028.The information provided to the Minister under subsection (1) is deemed to be information provided in the facility’s registration report. — SOR/2025-280, s. 19Schedule 1 to the Regulations is amended by replacing the references after the heading “SCHEDULE 1” with the following: — SOR/2025-280, s. 20Schedule 1 to the Regulations is amended by adding the following after item 4:4.1 The date on which the fugitive emission was detected.4.2 The flow rate of the fugitive emission, expressed in kg/h.4.3 If repair of the equipment component was deferred in accordance with subsection 8.15(6), the day to which the repair was deferred and the calculations that supported deferral to that day.4.4 If repair of the equipment component requires the shutdown of the upstream oil and gas facility, the day of the next shutdown scheduled in accordance with subsection 8.15(7) and the calculations that support scheduling it on that day. — SOR/2025-280, s. 21Schedule 2 to the Regulations is repealed. — SOR/2025-280, s. 22Schedule 3 to the Regulations is amended by replacing the references after the heading “SCHEDULE 3” with the following: — SOR/2025-280, s. 23Schedule 3 to the Regulations is amended by adding the following after item 6:7 Identification of the facility as either a Type 1 facility, a Type 2 facility or an inactive facility.
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.