75Allocation of group production#
An operator must ensure that group production of oil, gas and water from wells and the volume of fluids injected into those wells are allocated on a pro rata basis using the flow system, flow calculation procedure and flow allocation procedure approved under subsection 14(2).
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.