Where topsoil on agricultural land is disturbed or removed during construction of the pipeline, Foothills shall take such measures as are satisfactory to the landowner or tenant as soon as possible after the disturbance or removal to stabilize the surface or replace such topsoil of such agricultural land and to return it, as far as is practicable, to its previous level of productivity.