Part II · Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia · GlobalLawDB
Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia
Where Foothills is required to submit to the designated officer for approval the design and location of any permanent access road or pipeline facility, other than a road or facility on the pipeline right-of-way, and the procedures to be used in the constructing, operating or abandonment of the road or facility, Foothills shall take into account the local and regional environment including the following:
Foothills shall maintain every road surface in such a manner that cross drainage is both efficient and effective without causing accelerated erosion or ponding.
Unless otherwise directed by the designated officer, Foothills shall install a bridge or culvert at every place where a road crosses a permanent or intermittent river or stream.
Foothills shall, where required by the designated officer, render any access road built or rehabilitated by it, other than a road to be used by Foothills in the maintenance of the pipeline, impassable and take such measures as are satisfactory to the designated officer to control erosion of such road.
(1)Where Foothills builds any ice bridge it shall locate such ice bridge in a manner that minimizes approach grades and cuts in the river or stream over which the bridge is built.
(2)Foothills shall not use debris or fill in the construction of an ice bridge referred to in subsection (1).
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.