Part II · Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia · GlobalLawDB
Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia
Where, in this Part, Foothills is required to make plans, take measures and implement procedures in respect of the environment, Foothills shall
(a)incorporate in such plans, measures and procedures those environmental practices ordinarily followed in constructing and operating pipelines in the Province; and
(b)comply with those standards established under the laws of the Province that are applicable to any pipeline constructed and operated under the laws of the Province except where such standards are inconsistent with the Act, any terms and conditions made thereunder or any other law of Canada.
Foothills shall, in the planning and construction of the pipeline, minimize, to the satisfaction of the designated officer, any adverse environmental impact on land through which the pipeline passes and on waterbodies or groundwater in the vicinity of the pipeline.
Where Foothills proposes a location of the pipeline or a portion thereof to the designated officer for approval, Foothills shall, in a manner satisfactory to the designated officer, take into account the effect, if any, of the or of the pipeline on the existing or potential uses of any land or waterbody through which the pipeline is proposed to pass.
Foothills shall, in the construction and operation of the pipeline, take measures satisfactory to the designated officer to minimize to the satisfaction of the designated officer any change in the existing physical or biological conditions arising from the consequences of thaw settlement.
Foothills shall inspect, to the satisfaction of the designated officer, the implementation of the measures referred to in section 49 and shall, when requested by the designated officer, monitor to the satisfaction of the designated officer, the effectiveness of those measures.
Foothills shall design and implement erosion control measures satisfactory to the designated officer in respect of those areas through which the pipeline passes to minimize any interference with any other use of land or water and to protect the environment.
Foothills shall not leave significant quantities of deleterious substances, as defined in the Fisheries Act for the purpose of sections 31, 33, 33.1 and 33.2 of that Act, sediment, silt or wood chips resulting from the construction of the pipeline in any area where they are likely to enter into any waterbody.
(1)Foothills shall take such measures as are satisfactory to the designated officer to minimize the entry into any waterbody of any aqueous run-off or discharge resulting from the construction of the pipeline.
Where Foothills submits to the designated officer for his approval proposals for the design and location of a compressor station for the pipeline, Foothills shall include in the submission a description of the measures Foothills intends to implement
(a)to control air pollution and to disperse and, where possible, reduce any ice fog resulting from the operation of the pipeline; and
(b)to preserve the aesthetic value of the landscape in the vicinity of the pipeline.
Foothills shall, in the operation of a compressor station, take such measures as are satisfactory to the designated officer to minimize any adverse effects of air pollution and ice fog resulting from the of the pipeline on
Foothills shall, in the construction and operation of the pipeline, take such noise abatement measures as are satisfactory to the designated officer to minimize the disturbance by noise of
(a)persons residing in the vicinity of the pipeline;
(b)wildlife referred to in section 70, whose continued existence is threatened in the areas of land and set out in the list referred to in that section during the periods of time set out in the list in respect of such ; and
Foothills shall, when requested by the designated officer and following consultation with the government of the Province, submit to him for his approval a list setting out those areas of land and waterbodies in which, and the periods of time in respect of those areas and waterbodies during which, the construction or operation of the pipeline may
(a)threaten the continued existence of significant wildlife populations; or
(1)Foothills shall, when requested by the designated officer and following consultation with the government of the Province, submit to him for his approval a list setting out those areas of fish habitat in which, and the periods of time in respect of those areas during which, the construction or operation of the pipeline may threaten the continued existence of significant fish populations.
(2)The areas referred to in subsection (1) shall include fish spawning and rearing grounds, overwintering areas and migration routes in the through which the pipeline passes.
(1)Foothills shall, in consultation with the government of the Province, identify each area of natural or cultural significance in the vicinity of the proposed route of the pipeline and shall propose a location of the pipeline that, insofar as possible, does not pass through that area.
(2)Where the location referred to in subsection (1) of the pipeline is in an area identified under that subsection and the location of the pipeline has been approved by the designated officer, Foothills shall take such measures as are satisfactory to the designated officer to protect the natural and cultural values of that area.
Foothills shall take such measures as are satisfactory to the designated officer to minimize the adverse impact of the construction of the pipeline within 2 km of the limits of any park, or game sanctuary, ecological reserve, International Biological Program site, historical or archaeological site or research, conservation or recreation site proposed or established under any law of Canada or of the .
Foothills shall, when constructing the pipeline on land comprising part of an agricultural land reserve or grazing reserve, take into account the provisions set out in the document entitled “Terms and Conditions for Linear Development in Agricultural Land Reserves and Grazing Reserves” issued by the Ministry of Agriculture of the government of the Province.
Where topsoil on agricultural land is disturbed or removed during construction of the pipeline, shall take such measures as are satisfactory to the landowner or tenant as soon as possible after the disturbance or removal to stabilize the surface or replace such topsoil of such and to return it, as far as is practicable, to its previous level of productivity.
Foothills shall minimize to the satisfaction of the designated officer any adverse environmental impact of vegetation clearing operations by Foothills including such impact on erosion-sensitive terrain.
(a)establish procedures satisfactory to the designated officer to minimize the possibility of an accident occurring during the storage, handling and use of fuel or any other hazardous material;
(b)locate, in a manner satisfactory to the designated officer, storage and handling sites for fuel and hazardous material to minimize any contamination of any waterbody set out in the list referred to in section 70, any fish habitat set out in the list referred to in subsection 76(1) or any important fish harvesting area; and
(1)Foothills shall collect any liquid or solid wastes produced as a consequence of the construction, operation or abandonment of the pipeline and, where required by the designated officer, treat them in a manner satisfactory to the designated officer.
(2)Foothills shall dispose of the liquid or solid wastes referred to in subsection (1) in a manner satisfactory to the designated officer.
Foothills shall, when requested by the designated officer, submit to him site-specific data satisfactory to him on the hydrological or geotechnical conditions at any place where the pipeline crosses any waterbody.
(a)inspect every pipeline water crossing for evidence of deterioration in bank stability and stream bed condition, and
(b)when directed by the designated officer, monitor the consequences of any pipeline water crossing
in such manner as is satisfactory to the designated officer.
(2)Foothills shall report to the designated officer, within a reasonable period of time, the results of the referred to in paragraph (1)(a) and, when required by the designated officer, the results of the referred to in paragraph (1)(b).
Where Foothills withdraws water from or discharges water into a waterbody, it shall withdraw or discharge the water in a manner satisfactory to the designated officer and in a manner that will not have an unreasonably adverse effect on
(a)the level or rate of flow of water in the waterbody or well from which the water withdrawal is made or into which the discharge is made;
(b)the existing use of the waterbody from which the water withdrawal is made or into which the discharge is made;
(c)the transportation on or access to the waterbody from which the water withdrawal is made or into which the discharge is made;
(d)the trapping or fishing by persons residing in the vicinity of the pipeline;
(e)the fish populations in or dependent on the waterbody from which the water withdrawal is made or into which the discharge is made; and
(f)any waterfowl or mammal populations using any waterbody or its margins from which the water withdrawal is made or into which the discharge is made.
Where Foothills is required to submit to the designated officer for approval the design and location of any permanent access road or pipeline facility, other than a road or facility on the pipeline right-of-way, and the procedures to be used in the constructing, operating or abandonment of the road or facility, Foothills shall take into account the local and regional environment including the following:
Foothills shall take such measures as are satisfactory to the designated officer to minimize the use by Foothills of machinery, transportation and construction equipment in any area other than public and access roads and the pipeline right-of-way.
Where Foothills operates machinery, transportation or construction equipment within any waterbody, such operation shall take place during such time and in such manner as is satisfactory to the designated officer.
(1)Foothills shall, in a manner satisfactory to the designated officer, inspect the pipeline and the land and water disturbed by the pipeline, evaluate the results of the inspection and, when directed by the designated officer, monitor the environmental impact of the pipeline.
(2)When requested by the designated officer, Foothills shall, within a reasonable period of time, report the results of the inspection, evaluation and monitoring referred to in subsection (1) to the designated officer.
(1)Foothills shall submit to the designated officer for approval one or more plans or manuals that set out the procedures and measures by which Foothills intends to
(a)comply with this Part;
(b)carry out any environmental requirements imposed by law; and
(c)carry out the protection of the environment other than by measures required by this Part.
(2)Foothills shall, by such date as may be fixed by the designated officer, submit to the designated officer a plan schedule for his approval that sets out the date each plan or manual referred to in subsection (1) is to be submitted to the designated officer.
(3)The plan schedule referred to in subsection (2), when approved by the designated officer, constitutes ’ plan schedule and shall comply therewith.
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.
Foothills shall, in the construction and operation of the pipeline, minimize, to the satisfaction of the designated officer, the development of subsurface channels along the pipeline and
(a)any change in the natural drainage patterns, and
(b)any increase in the sediment loading in waterbodies
Foothills shall implement such measures as are satisfactory to the designated officer to rehabilitate land disturbed by the construction or operation of the pipeline.
Foothills shall take measures to revegetate land, other than agricultural land, to the satisfaction of the designated officer, disturbed by the construction or operation of the pipeline in a manner that complements any other measure Foothills takes to control drainage and erosion.
Where land is to be rehabilitated pursuant to section 54 or revegetated pursuant to section 55, Foothills shall rehabilitate or revegetate, as the case may be, the land in a manner consistent with present land use practices employed in that portion of the Province through which the pipeline passes and shall give priority to the following objectives:
(a)the control of erosion and its impacts,
(b)the protection or enhancement of important wildlife habitat, and
(c)the restoration of the aesthetic value of the land
and such priority shall be given in the order set out in paragraphs (a) to (c).
Where Foothills has backfilled any part of the pipeline under construction, Foothills shall, unless otherwise authorized by the designated officer, commence as soon as practicable but, in any event, within one year of the backfilling, the erosion control measures referred to in section 52, the rehabilitation measures referred to in section 54 and the revegetation measures referred to in section 55.
(a)where a revegetation measure referred to in section 55 is taken that involves the seeding of land, use only seed mixes acceptable to the government of the Province;
(b)take such measures as are satisfactory to the designated officer to minimize the entry of noxious weeds into the area through which the pipeline passes on construction equipment used by Foothills; and
(c)take such measures as are satisfactory to the designated officer to control infestations of noxious weeds caused by the construction of the pipeline.
(1)Foothills shall, from time to time, inspect, in a manner satisfactory to the designated officer, the implementation of the erosion control measures referred to in section 52, the rehabilitation measures referred to in section 54, the revegetation measures referred to in section 55 and the measures relating to noxious weeds referred to in paragraphs 58(b) and (c).
(2)Foothills shall, in carrying out the inspection pursuant to subsection (1), evaluate the effectiveness of the measures referred to in that subsection and, when requested by the designated officer, report to the designated officer in a manner satisfactory to him the results and evaluation of such inspection.
(3)Where, in the opinion of the designated officer, the measures referred to in subsection (1) are ineffective, Foothills shall implement such remedial measures as are satisfactory to the designated officer.
(2)Where there is any aqueous run-off or discharge referred to in subsection (1) and that run-off or discharge enters a waterbody, Foothills shall take such measures as are satisfactory to the designated officer to protect the quality of the water in the waterbody.
Where the construction or operation of the pipeline takes place within a waterbody, Foothills shall take such measures as are satisfactory to the designated officer to protect the quality of the water in that waterbody.
Foothills shall, when requested by the designated officer and at such intervals as are satisfactory to him, sample the water receiving aqueous run-off or discharge resulting from the construction or operation of the pipeline and analyze its quality by a method satisfactory to the designated officer.
(1)Foothills shall, at each compressor station selected by the designated officer,
(a)sample and analyze air quality in the vicinity of that compressor station,
(b)sample and analyze gaseous emissions from the compressor station, and
(c)record the quantity and type of fuel consumed at that compressor station
by a method and at times approved by the designated officer.
(2)Foothills shall report to the designated officer, when requested by him, the results of the sampling and analysis and measurements referred to in paragraphs (1)(a) and (b) and the record of the quantity and type of fuel consumed referred to in paragraph (1)(c).
(1)Foothills shall, when requested by the designated officer and in a manner satisfactory to him, measure noise levels caused by the operation of pipeline facilities and equipment and shall report, within a reasonable period of time, the noise levels so measured to the designated officer.
(2)Where, in the opinion of the designated officer, any noise level reported to him pursuant to subsection (1) disturbs persons, wildlife or livestock referred to in section 68, Foothills shall take such remedial measures as are satisfactory to the designated officer.
(b)result in significant adverse effects on significant wildlife populations.
Foothills shall, in a manner satisfactory to the designated officer, prepare construction schedules for the pipeline and propose the location of the pipeline in such a manner that when the construction of the pipeline is being carried out the adverse impact on wildlife in any areas and during any periods of time in respect of those areas set out in the list referred to in section 70 is minimized.
Foothills shall take such measures as are satisfactory to the designated officer to prevent big game animals from being obstructed or entrapped by the construction of the pipeline.
(1)Where requested by the designated officer, Foothills shall, during the construction and operation of the pipeline, monitor, at such locations and times and for such periods as are satisfactory to the designated officer, the impact resulting from the construction and operation of the pipeline on the habitat, seasonal distribution and movement of significant wildlife populations.
(2)Foothills shall, in carrying out the monitoring pursuant to subsection (1), evaluate the effectiveness of its measures to mitigate any adverse impact on significant wildlife populations and shall, when requested by the designated officer, report to him the result of such monitoring.
(a)the proposed location of the pipeline or the construction schedule of the pipeline referred to in section 71 is such that it does not minimize the adverse environmental impact on wildlife, or
(b)the measures taken pursuant to section 72 are ineffective
Foothills shall take such remedial measures as are satisfactory to the designated officer.
Foothills shall take such measures as are satisfactory to the designated officer to prevent the construction and operation of the pipeline from unreasonably interfering with hunting, guiding or trapping in the vicinity of the pipeline.
(3)The periods of time referred to in subsection (1) shall include those periods for the spawning, incubation, emergence and rearing and migration of the fish.
Where Foothills prepares construction schedules for the pipeline, Foothills shall prepare the schedule in such a manner that when the construction of the pipeline is carried out any adverse impact of the construction of the pipeline on the fish in any fish habitat and during the periods of time in respect of that habitat set out in the list referred to in subsection 76(1) is minimized to the satisfaction of the designated officer.
that may be disruptive to significant fish populations, Foothills shall take such measures as are satisfactory to the designated officer to avoid or minimize, to the satisfaction of the designated officer, any adverse environmental effects on significant fish populations and fish habitat.
Foothills shall implement construction and operation practices to protect, to the satisfaction of the designated officer, significant fish populations and fish habitat against any adverse effect of any siltation, excavation of granular materials, spills of fuel or toxic chemicals, changes in water temperature and chemistry or reduction in dissolved oxygen in the water in any waterbody through which the pipeline passes.
Foothills shall not, during the construction of the pipeline, unless permitted by the designated officer,
(a)obstruct fish migration routes during any periods set out in the list referred to in subsection 76(1) by any blockage, diversion or prolonged acceleration of water flow; or
(b)during such period, withdraw water from overwintering areas or from groundwater directly replenishing those areas.
Where Foothills places a culvert in a waterbody frequented by fish populations, Foothills shall take such measures as are satisfactory to the designated officer to allow the passage of fish populations through the culvert during any period set out in the list referred to in subsection 76(1).
Foothills shall take measures satisfactory to the designated officer to prevent the construction and operation of the pipeline from unreasonably interfering with any domestic, commercial or sport fishing or adversely affecting any fishing area in any area through which the pipeline passes.
(1)When requested by the designated officer, Foothills shall, in a manner satisfactory to him, monitor fish movements and fish habitat utilization during the construction of the pipeline.
(2)Foothills shall, in carrying out the monitoring referred to in subsection (1), evaluate the effectiveness of
(a)the construction schedule referred to in section 77,
(b)the measures referred to in sections 78, 81 and 82, and
(c)the practices referred to in section 79
and shall, when requested by the designated officer, report to the designated officer in a manner satisfactory to him the results of the evaluation and of the monitoring referred to in subsection (1).
Where, in the opinion of the designated officer, the measures or practices referred to in section 78, 79, 81 or 82 are ineffective, Foothills shall take such remedial measures as are satisfactory to the designated officer.
Foothills shall obtain the approval of the designated officer before commencing the construction of any portion of the pipeline within 30 m of a monument, archaeological site or burial ground.
Foothills shall, at any time at the request of the designated officer and at the termination of the archaeological program referred to in section 88, submit to the designated officer a report satisfactory to the designated officer of the results of that program.
Foothills shall provide, when requested by the designated officer, evidence satisfactory to the designated officer that any archaeological and related materials, field notes, plans and maps, photographs, analyses and other relevant documents collected during the archaeological program referred to in section 88 are retained at a place and under such arrangements as are approved by the government of the Province.
Foothills shall immediately report any discovery of a historical or archaeological site to the designated officer and shall not disturb the site without his prior approval.
(1)In constructing the pipeline, Foothills shall avoid, where practicable, disturbance of geodetic or legal survey monuments.
(2)Where a geodetic monument is disturbed in the course of the construction of the pipeline, Foothills shall report such disturbance forthwith to the designated officer.
(3)Where a geodetic monument is disturbed, Foothills shall, at its expense and in accordance with the instructions of the Dominion Geodesist, cause the monument to be restored or re-established.
Where, as a consequence of the construction of the pipeline, a fence or gate is damaged or destroyed by Foothills, Foothills shall, in consultation with the owner of the land on which the fence or gate is situated or the tenant thereof, repair or replace that fence or gate.
Where Foothills requires access to the pipeline for the purpose of maintenance through land that is fenced, Foothills shall, in consultation with the landowner or tenant, construct and maintain a gate in the fence for such access.
Where Foothills has stabilized the surface of agricultural land and returned it as far as is practicable to its previous level of productivity pursuant to section 94, Foothills shall
(a)inspect to the satisfaction of the landowner or tenant agricultural land that may have been or may be affected by the pipeline;
(c)take such remedial measures as directed by the designated officer in respect of any agricultural land discovered by the inspection to be affected by the pipeline.
(b)cut, stack and dispose of any merchantable timber cleared by Foothills in such manner as is satisfactory to the designated officer;
(c)leave a buffer strip of undisturbed vegetation satisfactory to the designated officer
(i)between any area cleared by Foothills of vegetation and an adjacent waterbody, and
(ii)between any area cleared of vegetation and an adjacent road;
(d)promptly remove any debris entering or likely to enter any waterbody as a result of the clearing of vegetation by Foothills; and
(e)take measures satisfactory to the designated officer to minimize windthrow in buffer strips.
(1)Foothills shall, when clearing any area for construction, take measures to minimize to the satisfaction of the designated officer the operation of any machinery along or across any permanent or intermittent river or stream channel.
(2)Foothills shall not skid any logs along or across any unfrozen permanent river or stream channel or along any unfrozen intermittent stream channel.
Foothills shall dispose of any debris resulting from the clearing of vegetation by Foothills in such manner as is satisfactory to the designated officer.
Foothills shall not pile any debris resulting from the construction of the pipeline in a manner that creates a continuous barrier to big game animal movements.
(c)establish procedures satisfactory to the designated officer to contain and clean up any fuel or other hazardous material spilled, misused or allowed to escape.
(1)Where Foothills uses a fuel storage area containing any above-ground tank exceeding 5 000 l in capacity, Foothills shall surround that area by a dyke of reinforced concrete or a dyke of earth lined with plastic or other impervious material.
(2)Foothills shall, in constructing a dyke referred to in subsection (1), comply with any requirements established by the designated officer for the design and location of the dyke and of the area that it surrounds.
(1)Where Foothills stores more than 5 000 l of fuel in storage facilities at any place, it shall
(a)establish procedures satisfactory to the designated officer to detect any loss of fuel from such storage facilities; and
(b)record all fuel transfers to and from such facilities.
(2)Where Foothills determines that a loss of fuel has occurred from a storage facility referred to in subsection (1), it shall investigate the cause of such loss and take such measures as are satisfactory to the designated officer to prevent further loss.
(2)Where there is any loss of hazardous material referred to in subsection (1), Foothills shall investigate the cause of the loss and take such measures as are satisfactory to the designated officer to prevent further loss.
Foothills shall submit to the designated officer for approval any proposed location for a liquid waste lagoon or solid waste disposal site for use by Foothills during the construction of the pipeline.
Foothills shall minimize to the satisfaction of the designated officer any contamination of any waterbody or groundwater by waste from solid waste disposal sites.
Foothills shall establish procedures satisfactory to the designated officer for the handling and disposal of any waste containing a hazardous material.
(1)Foothills shall meet any standards of composition as may be specified by the designated officer for the effluent from a liquid waste treatment system used by Foothills.
(2)Foothills shall discharge the effluent referred to in subsection (1) at times and under such conditions as are satisfactory to the designated officer.
Foothills shall establish procedures satisfactory to the designated officer to prevent access by carnivorous mammals and bears to waste disposal sites, incinerator sites or other waste storage or treatment sites and to minimize the attractiveness of such sites to such mammals and bears.
Foothills shall dispose of waste soil, rock, stumps, vegetation and other materials resulting from pipeline construction in such a manner as is satisfactory to the designated officer.
(1)Foothills shall not, without the approval of the designated officer, use a borrow pit or quarry adjacent to or within a waterbody, swamp, marsh, bog or fen.
(2)Where the use of a borrow pit or quarry referred to in subsection (1) has been approved by the designated officer, Foothills shall take such measures as are satisfactory to the designated officer to minimize siltation in that waterbody, swamp, marsh, bog or fen, as the case may be.
(1)When directed by the designated officer, Foothills shall close and rehabilitate, in a manner satisfactory to the designated officer, any borrow pit or quarry that it uses.
(2)Where Foothills is required to rehabilitate a borrow pit or quarry pursuant to subsection (1), it shall, to the satisfaction of the designated officer,
(a)stabilize the ground surface; and
(b)re-establish vegetation on such ground surface.
Where Foothills uses any granular materials for the construction of the pipeline, it shall use such granular materials in a manner satisfactory to the designated officer and compatible with any other use of such materials by persons residing in that portion of the Province through which the pipeline passes.
Where the designated officer is of the opinion that remedial measures are necessary at a pipeline water crossing, Foothills shall take such remedial measures as are satisfactory to the designated officer.
(a)in respect of every waterbody referred to in the list required to be submitted pursuant to section 70 in respect of the threatened existence of wildlife, and
(b)in respect of every waterbody containing a fish habitat area referred to in the list required to be submitted pursuant to subsection 76(1),
in which groundwater contributes significantly to winterflow in or under the bed of that waterbody, take such measures as are satisfactory to the designated officer to maintain adequate winter groundwater and channel flow in such waterbody.
Where the natural action of a stream will not restore the bed of such stream to its original shape and extent after the completion of construction, Foothills shall, unless otherwise directed by the designated officer, take measures to restore the stream to its original shape and extent by using the original material of the stream bed or other material of equivalent stability.
(1)Subject to subsection (2), Foothills shall not allow, during any withdrawal of water from a waterbody for hydrostatic testing, the rate of flow or depth of water in that waterbody to fall below such minimum as is specified by the designated officer.
(2)Foothills may withdraw water referred to in subsection (1) where the rate of flow and depth of water in the waterbody is below the minimum specified pursuant to that subsection if such withdrawal is approved by the designated officer.
Foothills shall, when designing or operating a camp water system, compressor station water system, granular material washing system or any other water related system, design or operate, as the case may be, that system in a manner that will minimize the use of water.
Where Foothills withdraws water for the construction or testing of the pipeline, it shall install screens satisfactory to the designated officer on all water intakes.
Foothills shall, in a manner satisfactory to the designated officer, furnish him with the details in respect of each water withdrawal or discharge used for testing the pipeline.
Foothills shall not discharge any hydrostatic test fluid unless the fluid meets such standards of composition for such test fluid as are satisfactory to the designated officer.
Foothills shall maintain every road surface in such a manner that cross drainage is both efficient and effective without causing accelerated erosion or ponding.
Unless otherwise directed by the designated officer, Foothills shall install a bridge or culvert at every place where a road crosses a permanent or intermittent river or stream.
Foothills shall, where required by the designated officer, render any access road built or rehabilitated by it, other than a road to be used by Foothills in the maintenance of the pipeline, impassable and take such measures as are satisfactory to the designated officer to control erosion of such road.
(1)Where Foothills builds any ice bridge it shall locate such ice bridge in a manner that minimizes approach grades and cuts in the river or stream over which the bridge is built.
(2)Foothills shall not use debris or fill in the construction of an ice bridge referred to in subsection (1).
Foothills shall equip and maintain all machinery and transportation and construction equipment with factory standard emission and noise control devices.
Where the designated officer is of the opinion that the construction or operation of the pipeline has caused or is likely to cause a significant adverse environmental impact, Foothills shall take such measures as are satisfactory to the designated officer to mitigate or remedy the environmental impact and to prevent its recurrence.
Where the designated officer approves a procedure or measure set out in a plan or manual submitted by Foothills pursuant to subsection 155(1), Foothills shall thereupon carry out such procedure or measure.
Where, subsequent to the approval by the designated officer of any of the measures or procedures referred to in subsection 155(1), Foothills obtains any additional information of environmental significance relating thereto, Foothills shall forthwith report such information to the designated officer.
(1)Foothills shall submit to the designated officer, in accordance with a schedule approved by him,
(a)the environmental information used by it in preparing the plans or manuals referred to in subsection 155(1);
(b)construction scheduling and engineering design information necessary for a review and evaluation of the plans or manuals referred to in subsection 155(1);
(c)environmental information necessary to evaluate potential environmental impacts; and
(d)information in respect of the environment in the vicinity of the pipeline prior to the commencement of the construction of the pipeline necessary to measure any environmental impact.
(2)When requested by the designated officer Foothills shall submit to him
(a)information in respect of those areas where thaw settlement may require measures to be taken to comply with section 49; and
(b)any studies, reports, analyses or other material on which the information submitted pursuant to section 70 and 76 are based.
(3)Where Foothills conducts studies or gathers data or information when considering the effect, if any, of the construction or operation of the pipeline on the existing or potential use of any land or waterbody through which the pipeline passes for the purpose of taking into account such effect pursuant to section 48, such studies, data or information shall be submitted by Foothills to the designated officer when requested by him.