Contents
- (a) Government Relief From Liability.—1 change
- (b) Air Traffic Control Contract Program.—39 changes
- (c) Safety Audits.—1 change
- (d) Criteria To Evaluate Participants.—
- (e) Definitions.—
- (f) Improving Controller Situational Awareness.—
- (g) Liability Insurance.—
- (h) Milestones for Design Approval of Remote Towers.—1 change
(b)
(1)
(A)The Secretary shall continue the low activity (Visual Flight Rules) level I air traffic control tower contract program established under subsection (a) of this section for towers existing on December 30, 1987, and extend the program to other towers as practicable.
(B)If the Secretary determines that a tower already operating under the Contract Tower Program has a benefit-to-cost ratio of less than 1.0, the airport sponsor or State or local government having jurisdiction over the airport shall not be required to pay the portion of the costs that exceeds the benefit—
(i)for the 1-year period after such determination is made; or
(ii)if an appeal of such determination is requested, for the 1-year period described in subsection (d)(4)(D).
(C)If the Secretary finds that all or part of an amount made available to carry out the program continued under this paragraph is not required during a fiscal year, the Secretary may use, during such fiscal year, the amount not so required to carry out the Cost-share Program.
(2)
(A)The Secretary may make a contract with a qualified entity (as determined by the Secretary) or, on a sole source basis, with a State or a political subdivision of a State to allow the entity, State, or subdivision to operate an airport traffic control tower classified as a level I (Visual Flight Rules) tower if the Secretary decides that the entity, State, or subdivision has the capability to comply with the requirements of this paragraph. The contract shall require that the entity, State, or subdivision comply with applicable safety regulations in operating the facility and with applicable competition requirements in making a subcontract to perform work to carry out the contract.
(B)In the case of a contract entered into on or after the date of enactment of this subparagraph to operate an airport traffic control tower at a small or medium hub airport, the contract shall require the Secretary, after coordination with the airport sponsor and the entity, State, or subdivision, and not later than 18 months after the date of enactment of the FAA Reauthorization Act of 2024, to provide funding sufficient for the cost of wages and benefits of at least 2 air traffic controllers for each tower operating shift.
(3)
(A)The Secretary shall establish a program to contract for air traffic control services at nonapproach control towers, as defined by the Secretary, that do not qualify for the Contract Tower Program.
(B)In carrying out the Cost-share Program, the Secretary shall—
(i)utilize for purposes of cost-benefit analyses, current, actual, site-specific data, forecast estimates, or airport master plan data provided by a facility owner or operator and verified by the Secretary; and
(ii)approve for participation only facilities willing to fund a pro rata share of the operating costs of the air traffic control tower to achieve a 1-to-1 benefit-to-cost ratio using actual site-specific contract tower operating costs in any case in which there is an operating air traffic control tower or a remote air traffic control tower equipment that has received System Design Approval from the Federal Aviation Administration, as required for eligibility under the Contract Tower Program.
(C)In selecting facilities to participate in the Cost-share Program, the Secretary shall give priority to the following facilities:
(i)Air traffic control towers that are participating in the Contract Tower Program but have been notified that they will be terminated from such program because the Secretary has determined that the benefit-to-cost ratio for their continuation in such program is less than 1.0.
(ii)Air traffic control towers that the Secretary determines have a benefit-to-cost ratio of at least .50.
(iii)Air traffic control towers of the Federal Aviation Administration that are closed as a result of the air traffic controllers strike in 1981.
(iv)Air traffic control towers located at airports or points at which an air carrier is receiving compensation under the essential air service program under this chapter.
(v)Air traffic control towers located at airports that are prepared to assume partial responsibility for maintenance costs.
(vi)Air traffic control towers located at airports with safety or operational problems related to topography, weather, runway configuration, or mix of aircraft.
(vii)Air traffic control towers located at an airport at which the community has been operating the tower at its own expense.
(viii)Air traffic control towers at airports with safety or operational problems related to the lack of an existing tower.
(ix)Air traffic control towers at airports with projected commercial and military increases in aircraft or flight operations.
(x)Air traffic control towers at airports with a variety of aircraft operations, including a variety of commercial and military flight operations.
(D)If the costs of operating an air traffic tower under the Cost-share Program exceed the benefits, the airport sponsor or State or local government having jurisdiction over the airport shall pay the portion of the costs that exceed such benefit, with the maximum allowable local cost share capped at 20 percent. Airports with air service provided under part 121 of title 14, Code of Federal Regulations, and more than 25,000 passenger enplanements in calendar year 2014 shall be exempt from any cost-share requirement under this paragraph.
(E)Of the amounts appropriated pursuant to section 106(k)(1), not more than $10,350,000 for each of fiscal years 2012 through 2018 may be used to carry out this paragraph.
(F)If the Secretary finds that all or part of an amount made available under this paragraph is not required during a fiscal year, the Secretary may use, during such fiscal year, the amount not so required to carry out the Contract Tower Program.
(G)Not later than 90 days after receiving an application to the Contract Tower Program, the Secretary shall calculate a benefit-to-cost ratio (as described in subsection (d)) for the applicable air traffic control tower for purposes of selecting towers for participation in the Contract Tower Program.
(H)The Secretary shall provide airport sponsors acting in good faith 7 years to complete an operational readiness inspection after receiving a benefit-to-cost ratio of air traffic control services for an airport.
(4)
(A)The Secretary may provide grants to a sponsor of—
(i)a primary airport—
(I)from amounts made available under sections 47114(c)(1) and 47114(c)(2) for the construction or improvement of a nonapproach control tower, as defined by the Secretary, and for the acquisition and installation of air traffic control, communications, and related equipment to be used in that tower;
(II)from amounts made available under sections 47114(c)(1) and 47114(c)(2) for reimbursement for the cost of construction or improvement of a nonapproach control tower, as defined by the Secretary, incurred after October 1, 1996, if the sponsor complied with the requirements of sections 47107(e), 47112(b), and 47112(c) in constructing or improving that tower; and
(III)from amounts made available under sections 47114(c)(1) and 47114(c)(2) for reimbursement for the cost of acquiring and installing in that tower air traffic control, communications, and related equipment that was acquired or installed after October 1, 1996, including remote air traffic control tower equipment certified by the Federal Aviation Administration or remote air traffic control tower equipment that has received System Design Approval from the Federal Aviation Administration; and
(ii)a public-use airport that is not a primary airport—
(I)from amounts made available under subsections (c) and (d) of section 47114 for the construction or improvement of a nonapproach control tower, as defined by the Secretary, and for the acquisition and installation of air traffic control, communications, and related equipment to be used in that tower;
(II)from amounts made available under sections 47114(c) and 47114(d)(2)(A) for reimbursement for the cost of construction or improvement of a nonapproach control tower, as defined by the Secretary, incurred after October 1, 1996, if the sponsor complied with the requirements of sections 47107(e), 47112(b), and 47112(c) in constructing or improving that tower; and
(III)from amounts made available under sections 47114(c) and 47114(d)(2)(A) for reimbursement for the cost of acquiring and installing in that tower air traffic control, communications, and related equipment that was acquired or installed after October 1, 1996, including remote air traffic control tower equipment certified by the Federal Aviation Administration or remote air traffic control tower equipment that has received System Design Approval from the Federal Aviation Administration.
(B)An airport sponsor shall be eligible for a grant under this paragraph only if—
(i)
(I)the sponsor is a participant in the Federal Aviation Administration Contract Tower Program or the Cost-share Program; or
(II)construction of a nonapproach control tower would qualify the sponsor to be eligible to participate in such program;
(iii)the Secretary affirmatively accepts the proposed contract tower into a contract tower program under this section and certifies that the Secretary will seek future appropriations to pay the Federal Aviation Administration’s cost of the contract to operate the tower to be constructed under this paragraph;
(iv)the sponsor certifies that it will pay its share of the cost of the contract to operate the tower to be constructed under this paragraph; and
(v)in the case of a tower to be constructed under this paragraph from amounts made available under section 47114(d)(2)(B), the Secretary certifies that—
(I)the Federal Aviation Administration has consulted the State within the borders of which the tower is to be constructed and the State supports the construction of the tower as part of its State airport capital plan; and
(II)the selection of the tower for funding is based on objective criteria.
United States Government work; public domain under 17 U.S.C. § 105.