(1)There is authorized an emergency fund to be expended in preparation for emergency response to any natural disaster, in flood fighting and rescue operations, or in the repair or restoration of any flood control work threatened or destroyed by flood, including the strengthening, raising, extending, realigning, or other modification thereof as may be necessary in the discretion of the Chief of Engineers for the adequate functioning of the work for flood control and subject to the condition that the Chief of Engineers may include modifications to the structure or project, or in implementation of nonstructural alternatives to the repair or restoration of such flood control work if requested by the non-Federal sponsor; in the emergency protection of federally authorized hurricane or shore protection being threatened when in the discretion of the Chief of Engineers such protection is warranted to protect against imminent and substantial loss to life and property; in the repair and restoration of any federally authorized hurricane or shore protective structure or project damaged or destroyed by wind, wave, or water action of other than an ordinary nature to the pre-storm level of protection, to the design level of protection, or, notwithstanding the authorized dimensions of the structure or project, to a level sufficient to meet the authorized purpose of such structure or project, whichever provides greater protection, when, in the discretion of the Chief of Engineers, such repair and restoration is warranted for the adequate functioning of the structure or project for hurricane or shore protection, including to ensure the structure or project is functioning adequately to protect against projected changes in wave action or height or storm surge (including changes that result from relative sea level change over the useful life of the structure or project), subject to the condition that the Chief of Engineers may, if requested by the non-Federal sponsor, include modifications to the structure or project (including the addition of new project features) to address major deficiencies, increase resilience, increase benefits from the reduction of damages from inundation, wave action, or erosion, or implement nonstructural alternatives to the repair or restoration of the structure. The emergency fund may also be expended for emergency dredging for restoration of authorized project depths for Federal navigable channels and waterways made necessary by flood, drought, earthquake, or other natural disasters. In any case in which the Chief of Engineers is otherwise performing work under this section in an area for which the Governor of the affected State has requested a determination that an emergency exists or a declaration that a major disaster exists under the Disaster Relief and Emergency Assistance Act [42 U.S.C. 5121 et seq.], the Chief of Engineers is further authorized to perform on public and private lands and waters for a period of ten days following the Governor’s request any emergency work made necessary by such emergency or disaster which is essential for the preservation of life and property, including, but not limited to, channel clearance, emergency shore protection, clearance and removal of debris and wreckage endangering public health and safety, and temporary restoration of essential public facilities and services. The Chief of Engineers, in the exercise of his discretion, is further authorized to provide emergency supplies of clean water, on such terms as he determines to be advisable, to any locality which he finds is confronted with a source of contaminated water causing or likely to cause a substantial threat to the public health and welfare of the inhabitants of the locality. The appropriation of such moneys for the initial establishment of this fund and for its replenishment on an annual basis, is authorized: Provided, That pending the appropriation of sums to such emergency fund, the Secretary of the Army may allot, from existing flood-control appropriations, such sums as may be necessary for the immediate prosecution of the work herein authorized, such appropriations to be reimbursed from the appropriation herein authorized when made. The Chief of Engineers is authorized, in the prosecution of work in connection with rescue operations, or in conducting other flood emergency work, to acquire on a rental basis such motor vehicles, including passenger cars and buses, as in his discretion are deemed necessary.
(2)
(A)In preparing a cost and benefit feasibility assessment for any emergency project described in paragraph (1), the Chief of Engineers shall consider the benefits to be gained by such project for the protection of—
(i)residential establishments;
(ii)commercial establishments, including the protection of inventory; and
(iii)agricultural establishments, including the protection of crops.
(B)
(i)The Chief of Engineers may carry out repair or restoration work described in paragraph (1) that does not produce benefits greater than the cost if—
(I)the non-Federal sponsor agrees to pay, or provide contributions equal to, an amount sufficient to make the remaining costs of the project equal to the estimated value of the benefits of the repair or restoration work; and
(II)the Secretary determines that—
(aa)the damage to the structure was not a result of negligent operation or maintenance; and
(bb)repair of the project could benefit another Corps project.
(ii)Non-Federal payments or contributions pursuant to clause (i) shall be in addition to any non-Federal payments or contributions required by the Chief of Engineers that are applicable to the remaining costs of the repair or restoration work.
(3)Upon request by a locality receiving assistance under the fourth sentence of paragraph (1), the Secretary shall, subject to the availability of appropriations, enter into an agreement with the locality to provide such assistance beyond the time period otherwise provided for by the Secretary under such sentence.
(4)In this subsection, the term “nonstructural alternatives” includes efforts to restore or protect natural resources, including streams, rivers, floodplains, wetlands, or coasts, if those efforts will reduce flood risk.
(5)
(A)Not later than 180 days after receiving, from a non-Federal sponsor of a project to repair or rehabilitate a flood control work described in paragraph (1), a request to initiate a feasibility study to further modify the relevant flood control work to provide for an increased level of protection, the Secretary shall provide to the non-Federal sponsor a written decision on whether the Secretary has the authority under section 549a of this title to undertake the requested feasibility study.