(c)
(1)The Secretary of Defense may waive the application of the survivability and lethality tests of this section to a covered system, munitions program, missile program, or covered product improvement program if the Secretary determines that live-fire testing of such system or program would be unreasonably expensive and impractical and submits a certification of that determination to Congress—
(A)before Milestone B approval for the system or program; or
(B)in the case of a system or program initiated at—
(i)Milestone B, as soon as is practicable after the Milestone B approval; or
(ii)Milestone C, as soon as is practicable after the Milestone C approval.
(2)In the case of a covered system (or covered product improvement program for a covered system), the Secretary may waive the application of the survivability and lethality tests of this section to such system or program and instead allow testing of the system or program in combat by firing munitions likely to be encountered in combat at components, subsystems, and subassemblies, together with performing design analyses, modeling and simulation, and analysis of combat data. Such alternative testing may not be carried out in the case of any covered system (or covered product improvement program for a covered system) unless the Secretary certifies to Congress, before the system or program enters system development and demonstration, that the survivability and lethality testing of such system or program otherwise required by this section would be unreasonably expensive and impracticable.
(3)The Secretary shall include with any certification under paragraph (1) or (2) a report explaining how the Secretary plans to evaluate the survivability or the lethality of the system or program and assessing possible alternatives to realistic survivability testing of the system or program.
(4)In time of war or mobilization, the President may suspend the operation of any provision of this section.