Contents
- 1. In the demarcated areas, the competent authorities shall c…
- 2. The surveys shall be carried out in accordance with Articl…
- 3. The survey design shall take into account the Authority’s…
- 4. In the cases where sentinel plants are used, those plants…
- 5. The results of the surveys carried out pursuant to this Ar…
3.The survey design shall take into account the Authority’s General guidelines for statistically sound and risk-based surveys and the survey design and sampling scheme used for detection surveys shall be able to identify with at least 95 % of confidence, a level of presence of the specified pest of 1 %.
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.