Contents
- 1. Member States shall ensure that the railway infrastructure…
- 10. The requirements set out in paragraphs 2 to 9 shall not ap…
- 11. Without prejudice to paragraph 10, at the request of a Mem…
- 2. Member States shall ensure that, by 31 December 2040, the…
- 3. Member States shall ensure that, on the railway infrastruc…
- 4. Member States shall ensure that, by 31 December 2040, the…
- 5. Member States shall ensure that, by 31 December 2040, the…
- 6. Member States shall ensure that, by 31 December 2030, the…
- 7. Member States shall ensure that, by 31 December 2040, the…
- 8. Member States shall ensure that, by 31 December 2040, line…
- 9. Member States shall ensure that, by 31 December 2030, the…
Article 16Transport infrastructure requirements for the core network and the extended core network#
1.Member States shall ensure that the railway infrastructure of the core network and the extended core network complies with Article 15(1).
10.The requirements set out in paragraphs 2 to 9 shall not apply to isolated networks.
11.Without prejudice to paragraph 10, at the request of a Member State, in duly justified cases, the Commission shall adopt implementing acts granting exemptions in respect of requirements referred to in this Article on the ground of specific geographical or significant physical constraints, negative result of socio-economic cost-benefit analysis or significant negative impacts on environment or biodiversity. Any such request shall be substantiated with sufficient justification. The request for exemptions shall be coordinated with the neighbouring Member State or Member States in the case of cross-border sections. The neighbouring Member States may provide an opinion to the Member State requesting the exemption. The Member State shall attach the opinions of the neighbouring Member States to its request. A Member State may request the granting of several exemptions in a single request.The Commission shall assess the request in the light of the justification provided as well as in terms of its significant impact on interoperability and continuity of the railway network, where relevant. The Commission shall take duly into account the opinions of the neighbouring Member States concerned.When assessing requests for exemptions from the requirement related to carriage of the semi-trailers set out in paragraph 8, the Commission shall take particularly into consideration the results of the socio-economic cost-benefit analysis as well as the potential disruption of the services caused by the necessary works needed to meet that requirement.When assessing requests for the exemptions from the requirements laid down in this Article for the extended core network, the Commission shall take particularly into consideration any major investment undertaken by the Member State concerned on a parallel line in close proximity to the ones to be newly constructed.The Commission may ask for additional information from the Member State no later than 30 calendar days following the receipt of request pursuant to the first subparagraph. If the Commission considers that the information provided is insufficient, it may ask the Member State to supplement that additional information within 30 calendar days from the receipt of that additional information.The Commission shall take a decision on the requested exemption no later than six months following the receipt of the request pursuant to the first subparagraph or, in the event that further information has been provided by the Member States concerned pursuant to the third subparagraph, no later than four months following the latest receipt of such information, whichever is later. In the absence of an explicit decision by the Commission within such time-limits, the exemption shall be deemed to be granted.The Commission shall inform other Member States of the exemptions granted pursuant to this Article.
2.Member States shall ensure that, by 31 December 2040, the railway infrastructure of the extended core network, except connections referred to in Article 14(1), point (d), for lines that are part of the network for freight transport:
(a)meets the requirements set out in Article 15(2), points (a) and (b);
(b)enables, without special permission, the operation of freight trains with a train length of at least 740 m (including the locomotive or locomotives). This requirement is met if at least the following conditions are complied with:
(i)on double track lines, at least one train path per two hours and direction and not less than 24 train paths on daily basis, can be allocated to freight trains with a length of at least 740 m if requested by a railway undertaking;
(ii)on single track lines, at least one train path per three hours and direction and not less than 12 train paths on daily basis, can be allocated to freight trains with a length of at least 740 m if requested by a railway undertaking; and
(c)for rail sections linking the multimodal freight terminals of two urban nodes or the multimodal freight terminal of an urban node and a border crossing point, over 75 % of the length of each rail section, is designed for a speed of at least 100 km/h for freight trains on the freight lines of the extended core network.
3.Member States shall ensure that, on the railway infrastructure of the extended core network, in the case of the construction of a new line, the requirement set out in Article 15(2), point (a), is complied with by 31 December 2030. Projects for which the environmental impact assessment has been initiated by 18 July 2024 shall be excluded from this obligation.
4.Member States shall ensure that, by 31 December 2040, the railway infrastructure of the extended core network, except connections referred to in Article 14(1), point (d), for lines that are part of the network for passenger transport:
(a)meets the requirements set out in Article 15(2), point (a), on the passenger lines of the extended core network; and
(b)for rail sections linking the multimodal passenger hubs of two urban nodes or the multimodal passenger hubs of an urban node and a border crossing point, over 75 % of the length of each rail section is designed for a speed of at least 160 km/h for passenger trains on the passenger lines of the extended core network.
5.Member States shall ensure that, by 31 December 2040, the railway infrastructure of the extended core network on the connections referred to in Article 14(1), point (d), meets the requirements set out in Article 15(2), points (a) and (b), and in paragraph (2), point (b), of this Article unless, with respect to the requirements set out in paragraph (2), point (b), of this Article, an exemption from the application of Article 38(3) has been granted pursuant to Article 38(4).
6.Member States shall ensure that, by 31 December 2030, the railway infrastructure of the core network, except connections referred to in Article 14(1), point (d):
(a)for lines that are part of the network for freight transport: meets the requirements set out in paragraph (2), points (a), (b) and (c) of this Article; and
(b)for the lines that are part of the network for passenger transport: meets the requirements set out in Article 15(2), point (a).
7.Member States shall ensure that, by 31 December 2040, the railway infrastructure that is part of the core network for passenger transport, except connections referred to in Article 14(1), point (d), meets the requirement set out in paragraph (4), point (b) of this Article.
8.Member States shall ensure that, by 31 December 2040, lines for freight transport that are part of the railway infrastructure of the core network or extended core network, including connections referred to in Article 14(1), point (d), allow for the circulation of freight trains carrying standard semi-trailers up to 4 m high, loaded at a height of at least 27 cm above the top of the rail track on the European Transport Corridors on their territories.This requirement shall be deemed to be met if at least the following conditions are complied with on each European Transport Corridor on the territory of the Member State:
(a)there is at least one direct line meeting that requirement enabling uninterrupted operation of trains in the territory of a Member State and on cross-border lines with each neighbouring Member State;
(b)there is at least one direct line meeting that requirement to at least one rail road terminal or one multimodal freight terminal located in or adjacent to a maritime port which is part of the European Transport Corridor on the territory of a Member State; and
(c)there is at least one direct line meeting that requirement to at least one of these end points if one or more end points of a corridor are located on the territory of a Member State.
For cross-border sections, the determination of the lines concerned shall be made in agreement with the neighbouring Member States concerned.At the latest by 19 July 2027, Member States shall notify the Commission of the lines concerned.
9.Member States shall ensure that, by 31 December 2030, the railway infrastructure of the core network on the connections referred to in Article 14(1), point (d), meets the requirements set out in Article 15(2), points (a) and (b), and in paragraph (2), point (b) of this Article, unless, with respect to the requirements set out in paragraph (2), point (b) of this Article, an exemption from the application of Article 38(3) has been granted by the Commission pursuant to Article 38(4).