Contents
- 1. Member States shall ensure that the railway infrastructure…
- 2. Member States shall ensure that, by 31 December 2050, the…
- 3. The requirements set out in paragraph 2, points (b) and (c…
- 4. Member States shall ensure that, by 31 December 2050, the…
- 5. Member States shall ensure that, on the railway infrastruc…
- 6. The requirements set out in paragraphs 2 and 4 shall not a…
- 7. Without prejudice to paragraph 6, at the request of a Memb…1 change
Article 15Transport infrastructure requirements for the comprehensive network#
1.Member States shall ensure that the railway infrastructure of the comprehensive network complies with:
(a)Directive (EU) 2016/797 and the implementing acts adopted thereunder in order to achieve the interoperability of the comprehensive network; and
(b)the requirements of the technical specifications for interoperability (TSIs) adopted pursuant to Articles 4 and 5 of Directive (EU) 2016/797 without prejudice to the exemptions provided for in Article 7(1) of that Directive.
2.Member States shall ensure that, by 31 December 2050, the railway infrastructure of the comprehensive network, except connections referred to in Article 14(1), point (d):
(a)is fully electrified as regards line tracks and, to the extent necessary for electric train operations, as regards sidings;
(b)enables, without special permission, an axle load of at least 22,5 tonnes; and
(c)enables, without special permission, the operation of freight trains with a train length of at least 740 m (including the locomotive or locomotives). This requirement is met if, on double track lines, at least one train path per hour and direction on average on a daily basis, can be allocated to freight trains with a length of at least 740 m if requested by a railway undertaking.
3.The requirements set out in paragraph 2, points (b) and (c), shall apply only on those lines of the comprehensive network which:
(a)connect a multimodal freight terminal or a maritime or an inland port with its closest crossing point with the core freight network or extended core freight network;
(b)constitute a re-routing line of a line that is part of the core freight network or extended core freight network; or
(c)operate more than ten freight trains per day on average in both directions based on the data for the previous year prior to the notification.
By 19 July 2027, Member States shall notify the Commission of the lines concerned. For cross-border sections, such notification shall be made in agreement with the other Member States concerned.
4.Member States shall ensure that, by 31 December 2050, the railway infrastructure of the comprehensive network on the connections referred to in Article 14(1), point (d), and which is connected to railway lines used for freight transport referred to in Article 15(3) meets the requirements set out in paragraph 2, points (a), (b) and (c), of this Article unless, with respect to the requirements set out in paragraph 2, point (c), of this Article an exemption from the application of Article 38(3) has been granted by the Commission pursuant to Article 38(4).
5.Member States shall ensure that, on the railway infrastructure of the comprehensive network, in the event of the construction of a new line, the requirement set out in paragraph 2, point (a), is complied with by 31 December 2040. Projects for which the environmental impact assessment has been initiated by 18 July 2024 shall be excluded from this obligation.
6.The requirements set out in paragraphs 2 and 4 shall not apply to isolated networks.
7.Without prejudice to paragraph 6, at the request of a Member State, in duly justified cases, the Commission shall adopt implementing acts granting exemptions in respect of requirements referred to in paragraphs 2 to 5 on grounds of specific geographical or significant physical constraints, negative result of socio-economic cost-benefit analysis or significant negative impacts on environment or biodiversity. Any such request shall be substantiated with sufficient justification. The request for exemptions shall be coordinated with the neighbouring Member State or Member States in the case of cross-border sections. The neighbouring Member States may provide an opinion to the Member State requesting the exemption. The Member State shall attach the opinions of the neighbouring Member States to its request. A Member State may request the granting of several exemptions in a single request.The Commission shall assess the request in the light of the justification provided, as well as in terms of its significant impact on interoperability and continuity of the railway network where relevant. The Commission shall take duly into account the opinions of the neighbouring Member States concerned.The Commission may ask for additional information from the Member State no later than 30 calendar days following the receipt of request pursuant to the first subparagraph. If the Commission considers that the information provided is insufficient, it may ask the Member State to supplement that additional information within 30 calendar days from the receipt of that additional information.The Commission shall take a decision on the requested exemption no later than six months following the receipt of the request pursuant to the first subparagraph or, in the event that further information has been provided by the Member States concerned pursuant to the third subparagraph, no later than four months following the latest receipt of such information, whichever is later. In the absence of an explicit decision by the Commission within such time-limits, the exemption shall be deemed to be granted.The Commission shall inform other Member States of the exemptions granted pursuant to this Article.
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.