law://eu/reg/2016/155@2026-11-19THE EUROPEAN COMMISSION,Having regard to the Treaty on the Functioning of the European Union,Having regard to Regulation (EU) No 1233/2011 of the European Parliament and of the Council of 16 November 2011 on the application of certain guidelines in the field of officially supported export credits and repealing Council Decisions 2001/76/EC and 2001/77/ECnote and in particular Article 2 thereof,Whereas:
HAS ADOPTED THIS REGULATION:
| PROJECT CLASS | DEFINITION | RATIONALE | STANDARDS USED | REPAYMENT TERMS |
|---|---|---|---|---|
| TYPE 1: Fossil Fuel Power Plants with Operational Carbon Capture and Storage (CCS) | A process consisting of the separation of CO2 stream from the emissions produced by fossil fuel generation sources, transport to a storage site, for the purposes of environmentally safe and permanent geological storage of CO2. | To achieve low carbon emission levels for fossil fuel power sources. | Carbon intensity shall achieve a level equal to or less than 350 metric ton CO2 per GWh vented to atmospherenote; Or In the case of all projects, a capture and storage rate that would reduce the plant's carbon emissions by 65 % or greater; Or The capture rate has to be at least 85 % of CO2 emitted by the equipment included in the application for officially supported export credits. The 85 % is to apply at normal operating conditions. | 18 years |
| TYPE 2: CCS Projects as such | A process consisting of the separation of CO2 from industrial or energy generation sources, transport to a storage site, for the purposes of environmentally safe and permanent geological storage of CO2. | To significantly reduce carbon emissions from existing sources. |
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.
| Repayment Term (years) | New nuclear power stationsnote | All other contractsnote | ||
|---|---|---|---|---|
| Base Rate (Government bonds) | Margin (bps) | Base Rate (Government bonds) | Margin (bps) | |
| < 11 | Relevant CIRR in accordance with Article 20 of the Arrangement | |||
| 11 to 12 | 7 years | 100 | 7 years | 100 |
| 13 | 8 years | 120 | 7 years | 120 |
| 14 | 9 years | 120 | 8 years | 120 |
| 15 | 9 years | 120 | 8 years | 120 |
| 16 |
| Repayment term (years) | Standard minimum interest rates | Minimum interest rates for projects with long construction periods, i.e.: New large hydro-power projects Appendix II Project Class A Appendix III Adaptation Projects | ||
|---|---|---|---|---|
| Government bonds (years) | Margin (bps) | Government bonds (years) | Margin (bps) | |
| < 11 | Relevant CIRR in accordance with Article 20 of the Arrangement | |||
| 11 to 12 | 7 | 100 | 7 | 100 |
| 13 | 7 | 120 | 8 | 120 |
| 14 | 8 | 120 | 9 | 120 |
| 15 | 8 | 120 | 9 | 120 |
| 16 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
|---|---|---|---|---|---|---|---|
| a | 0,090 | 0,200 | 0,350 | 0,550 | 0,740 | 0,900 | 1,100 |
| b | 0,350 | 0,350 | 0,350 | 0,350 | 0,750 | 1,200 | 1,800 |
| Country Risk Category | ||||||
|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| SOV+ | SOV+ | SOV+ | SOV+ | SOV+ | SOV+ | SOV+ |
| SOV/CC0 | SOV/CC0 | SOV/CC0 | SOV/CC0 | SOV/CC0 | SOV/CC0 | SOV/CC0 |
| CC1 AAA to AA- | CC1 A+ to A- | CC1 BBB+ to BBB- | CC1 BB+ to BB | CC1 BB- | CC1 B+ | CC1 B |
| CC2 A+ to A- | CC2 BBB+ to BBB- | CC2 BB+ to BB | CC2 BB- | CC2 B+ | CC2 B | CC2 B- or worse |
| CC3 BBB+ to BBB- | CC3 BB+ to BB | CC3 BB- | CC3 B+ | CC3 B | CC3 B- or worse | |
| CC4 BB+ to BB | CC4 BB- | CC4 B+ | CC4 B | CC4 B- or worse | ||
| CC5 BB- or worse | CC5 B+ or worse | CC5 B or worse | CC5 B- or worse |
| Buyer Risk Category | Country Risk Category | ||||||
|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| SOV+ | 0,000 | 0,000 | 0,000 | 0,000 | 0,000 | 0,000 | 0,000 |
| SOV/CC0 | 0,000 | 0,000 | 0,000 | 0,000 | 0,000 | 0,000 | 0,000 |
| CC1 | 0,110 | 0,120 | 0,110 | 0,100 | 0,100 | 0,100 | 0,125 |
| CC2 | 0,200 | 0,212 | 0,223 | 0,234 | 0,246 | 0,258 | 0,271 |
| CC3 | 0,270 | 0,320 | 0,320 | 0,350 | 0,380 |
| Product Quality | Country Risk Category | ||||||
|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| Below Standard | 0,9965 | 0,9935 | 0,9850 | 0,9825 | 0,9825 | 0,9800 | 0,9800 |
| Standard | 1,0000 | 1,0000 | 1,0000 | 1,0000 | 1,0000 | 1,0000 | 1,0000 |
| Above Standard | 1,0035 | 1,0065 | 1,0150 | 1,0175 | 1,0175 | 1,0200 | 1,0200 |
| Country Risk Category | |||||||
|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| Percentage of cover coefficient | 0,00000 | 0,00337 | 0,00489 | 0,01639 | 0,03657 | 0,05878 | 0,08598 |
| Credit Enhancement | Definition | Maximum CEF |
|---|---|---|
| Assignment of Contract Proceeds or Receivables | In the event a borrower has contracts with strong off-takers, whether offshore or local, a legally enforceable assignment of the contract provides rights to enforce the borrower's contracts and/or make decisions under major contracts in the place of the borrower after a default under the loan. A direct agreement with a third party in a transaction (a local government agency in a mining or energy transaction) allows Lenders to approach a government to seek remedies for expropriation or other violation of contractual obligations related to the transaction. An existing company operating in a difficult market or sector may have receivables related to the sale of production with a company or companies located in a more stable environment. Receivables would generally be in a hard currency but may not be the subject of a specific contractual relationship. Assignment of these receivables could provide asset security in the accounts of the Borrower, giving the Lender a preferential treatment in the cash flow generated by the Borrower. | 0,10 |
| Asset Based Security | Control of an asset shown by: (1) mortgage on very mobile and valuable piece of property and (2) property that has entire value in itself. An asset based security is one that can be reacquired with relative ease such as a locomotive, medical equipment or construction equipment. In valuing such a security, the ECA should take into consideration the legal ease of recovery. In other words, there is more value when the security interest in the asset is perfected under an established legal regime and less value where the legal ability to recover the asset is questionable. The precise value of an asset-based security is set by the market, with the relevant “market” being deeper than a local market because the asset can be moved to another jurisdiction. NOTE: The application of an asset based security credit enhancement applies to the buyer risk, where the asset based security is held internally within the country in which the transaction is domiciled. | 0,25 |
| Fixed Asset Security | A fixed asset security is most typically component equipment which may be constrained by its physicality such as turbine or manufacturing machinery integrated into an assembly line. The intent and value of the fixed asset security is to provide the ECA with more leverage over the use of the asset in recouping losses in the event of default. The value of a fixed asset security varies dependant on economic, legal, market and other factors. | 0,15 |
| Escrow Account | Escrow accounts involve debt service reserve accounts held as security for the lenders or other forms of cash receivable accounts held as security for the lenders by a party not controlled or sharing common ownership with the buyer/obligor. The escrowed amount must be deposited or escrowed in advance. The value of such security is nearly always 100 % of the nominal amount in such cash accounts. Permits greater control over use of cash, ensures that debt is serviced before discretionary spending. NOTE: The application of an escrow account credit enhancement applies to the buyer risk, where the escrow account is held internally within the country in which the transaction is domiciled. Cash security significantly diminishes the risk of default for the covered instalments. | escrowed amount as % of credit up to a maximum of 0,10 |
| In the case of all projects, a capture and storage rate that would reduce the industrial or energy generation carbon emissions by 65 % or greater; or The capture rate has to be at least 85 % of CO2 emitted by the equipment included in the application for officially supported export credits. The 85 % is to apply at normal operating conditions. |
| 18 years |
| TYPE 1: Waste to Energy | Unit dedicated to generating energy by thermal treatment (including gasification) of mixed stream solid waste. | To offset GHG emissions from the use of conventional power and by reducing future GHG such as methane that would normally emanate from the waste. | In the case of a steam cycle, a boiler (or steam generator) energy conversion efficiency of at least 75 % based on low heating value (LHV)note. In the case of gasification, a gasifier efficiency of at least 65 % LHVnote. | 15 years |
| TYPE 2: Hybrid Power Plants | A power plant that generates electric power from both a renewable energy source and a fossil fuel source. | To meet the requirement of plant availability, a fossil fuel generating source is required for those periods when power from the renewable energy source is not available or sufficient. The fossil fuel source enables the usage of renewable energy in the hybrid plant, thereby achieving a significant carbon reduction compared with standard fossil fuel plant. | Model 1: Two separate generation sources: one Renewable Energy and one fossil fuel. Project shall be designed such that at least 50 % of its projected total annual energy output originates from the plant's renewable energy source. Model 2: Single generation source using the combination of renewable and fossil fuel. The project shall be designed such that at least 75 % of the useful energy produced is derived from the renewable source. | 15 years |
| TYPE 1: Combined Heat & Power projects | Simultaneous generation of multiple forms of energy (electrical, mechanical and thermal) in a single integrated system. Output of the CHP plant shall include electric or mechanical energy and heat for commercial industrial and/or residential use. | Up to two thirds of the primary energy used to generate electricity in conventional thermal power plants is lost in the form of heat. Combined heat and power (CHP) generation can therefore be an effective GHG mitigation option. CHP is possible with all heat machines and fuels (including biomass and solar thermal) from a few kW-rated to 1000 MW steam-condensing power plantsnote. | Overall efficiency of at least 75 % based on low heating value (LHV)note. | 15 years |
| TYPE 2: District heating and/or cooling | Network which carries/distributes thermal energy from energy producing unit to end use. | To improve the efficiency of heating of districts by building piping networks for steam and/or hot water with substantial thermal efficiency, both by minimising losses of piping and converters, and by increasing the amount of utilisation of waste heat. District cooling is an integrative technology that can make significant contributions to reducing emissions of carbon dioxide and air pollution and to increasing energy security e.g. via substitution of individual air-conditioners. | The district piping thermal conductivity shall be less than 80 % of the relevant thermal conductivity required by the European standard EN253:2009 (to be reviewed when this standard is updated). | 15 years |
| 125 |
| 9 years |
| 120 |
| 17 | 10 years | 130 | 9 years | 120 |
| 18 | 10 years | 130 | 10 years | 120 |
| 120 |
| 10 |
| 125 |
| 17 | 9 | 120 | 10 | 130 |
| 18 | 10 | 120 | 10 | 130 |
| 0,480 |
| n/a |
| CC4 | 0,405 | 0,459 | 0,495 | 0,540 | 0,621 | n/a | n/a |
| CC5 | 0,630 | 0,675 | 0,720 | 0,810 | n/a | n/a | n/a |