1.Introduction1.1.Technical scope1.1.1.Scope related to tunnels1.1.2.Scope related to rolling stock1.1.3.Scope related to operational aspects1.1.4.Risk scope1.2.Geographical scope2.Definition of aspect/scope2.1.General2.2.The risk scenarios2.2.1.‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic smoke or gases.2.2.2.‘Cold’ incidents: collision, derailment2.2.3.Prolonged stop2.2.4.Exclusions2.3.The role of emergency response services2.4.Definitions3.Essential requirements3.1.Infrastructure and energy subsystems3.2.Rolling stock subsystem4.Characterisation of the subsystem4.1.Introduction4.2.Functional and technical specifications of the subsystems4.2.1.Subsystem Infrastructure4.2.2.Subsystem Energy4.2.3.Subsystem rolling stock4.3.Functional and technical specifications of the interfaces4.3.1.Interfaces with the Control-Command-Signalling subsystem4.3.2.Interfaces with the Traffic Management and Operation subsystem4.4.Operating rules4.4.1.Emergency rule4.4.2.Tunnel emergency plan4.4.3.Exercises4.4.4.Switching off and Earthing procedures4.4.5.Provision of on-train safety and emergency information to passengers4.4.6.Operational rules related to trains running in tunnels4.5.Maintenance rules4.5.1.Infrastructure4.5.2.Maintenance of rolling stock4.6.Professional qualifications4.6.1.Tunnel specific competence of the train crew and other staff4.7.Health and safety conditions4.7.1.Self-rescue device4.8.Infrastructure and Rolling stock registers4.8.1.Register of infrastructure4.8.2.Rolling Stock Register5.Interoperability constituents6.Assessment of conformity and/or suitability for use of the constituents and verification of the subsystem6.1.Interoperability constituents6.2.Subsystems6.2.1.EC verification (general)6.2.2.Procedures for EC verification of a subsystem (modules)6.2.3.Existing solutions6.2.4.Innovative solutions6.2.5.Assessment of maintenance6.2.6.Assessment of conformity to the Safety requirements applying to the Infrastructure and Energy subsystems6.2.7.Additional requirements for assessment of specifications concerning the IM6.2.8.Additional requirements for assessment of specifications concerning the RU7.Implementation7.1.Application of this TSI to new subsystems7.1.1.General7.1.2.New rolling stock7.1.3.New Infrastructure7.2.Application of this TSI to subsystems already in service7.2.1.Upgrade or renewal of rolling stock7.2.2.Upgrade and renewal measures for tunnels7.2.3.Operation subsystem7.2.4.Operation of new rolling stock in existing tunnels7.3.Specific cases7.3.1.General7.3.2.Operational rules related to trains running in tunnels (clause 4.4.6)Appendix A:Standards or Normative Documents Referred to in this TSIAppendix B:Assessment of the Subsystems