Contents
THE EUROPEAN COMMISSION,Having regard to the Treaty on the Functioning of the European Union,Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/ECnote, and in particular Article 16 thereof,Whereas:
(1)Article 6(2) of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities published pursuant to Article 16 of that Regulation.
(2)The European List is set out in Commission Implementing Decision (EU) 2016/2323note.
(3)Denmark has informed the Commission that a ship recycling facilitynote located in its territory has been authorised by the competent authority, in accordance with Article 14 of Regulation (EU) No 1257/2013. Denmark has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
(4)Norway has informed the Commission that a ship recycling facilitynote located in its territory has been authorised by the competent authority, in accordance with Article 14 of Regulation (EU) No 1257/2013. Norway has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
(5)The authorisation of a ship recycling facility located in Lithuanianote expired on 17 March 2020 and the Commission has received information from Lithuania that the facility does not continue ship recycling activities. The European List should therefore be updated to remove that facility.
(6)The authorisation of a ship recycling facility located in Latvianote expired on 11 June 2020 and the Commission has received information from Latvia that the authorisation granted to that facility to conduct ship recycling has not been renewed. Therefore, the facility no longer meets the requirements set out in Article 13(1)(a) of Regulation (EU) No 1257/2013. The European List should therefore be updated to remove that facility.
(7)The authorisation of a ship recycling facility located in the United Kingdomnote expired on 2 July 2020 and the Commission has not received information from the United Kingdom that the authorisation granted to that facility to conduct ship recycling has been renewed. Therefore, the facility no longer meets the requirements set out in Article 13(1)(a) of Regulation (EU) No 1257/2013. The European List should therefore be updated to remove that facility.
(8)The authorisation of another ship recycling facility located in the United Kingdomnote expired on 6 October 2020 and the Commission has received information from the United Kingdom that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. However, following the withdrawal of the United Kingdom from the Union on 1 February 2020, ships flying the flag of a Member State of the European Union can no longer be recycled at that facility after the end of the transition period provided for under the Withdrawal Agreement on 31 December 2020. The date of expiry of the inclusion of that facility in the European List should therefore be updated accordingly, i.e. until 31 December 2020.
(9)The authorisation of another ship recycling facility located in the United Kingdom will expire on 2 November 2022. However, following the withdrawal of the United Kingdom from the Union on 1 February 2020, ships flying the flag of a Member State of the European Union can no longer be recycled at that facility after the end of the transition period provided for under the Withdrawal Agreement on 31 December 2020. The date of expiry of the inclusion of that facility in the European List should therefore be updated accordingly, i.e. until 31 December 2020.
(10)The authorisation of another ship recycling facility located in the United Kingdomnote expired on 3 August 2020 and the Commission has received information from the United Kingdom that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. Therefore, and considering that Regulation (EU) No 1257/2013 is made applicable to and in the United Kingdom in respect of Northern Ireland by the Protocol on Ireland/Northern Ireland, the facility can stay on the European List after the end of the transition period and until the date of expiry of the new authorisation. The date of expiry of the inclusion of that facility in the European List should therefore be updated accordingly.
(11)The authorisation of a ship recycling facility located in Spainnote expired on 28 July 2020 and the Commission has received information from Spain that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of that facility in the European List should therefore be updated.
(12)The authorisation of two ship recycling facilities located in Lithuanianote expired on 17 March 2020 and on 21 May 2020, respectively, and the Commission has received information from Lithuania that the authorisation granted to those facilities to conduct ship recycling have been renewed prior to their expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of those facilities in the European List should therefore be updated.
(13)The authorisation of a ship recycling facility located in Portugalnote expired on 26 July 2020 and the Commission has received information from Portugal that the authorisation granted to that facility to conduct ship recycling has been renewed prior to its expiry, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of that facility in the European List should therefore be updated.
(14)The authorisation of a ship recycling facility located in Francenote will expire on 24 May 2021 and the Commission has received information from France that the authorisation granted to that facility to conduct ship recycling has been renewed, in accordance with Article 14 of Regulation (EU) No 1257/2013. The date of expiry of the inclusion of that facility in the European List should therefore be updated.
(15)The Commission has received applications, in accordance with Article 15(1) of Regulation (EU) No 1257/2013, for two ship recycling facilities located in Turkeynote to be included in the European List. Having assessed the information and supporting evidence provided or gathered in accordance with Article 15 of that Regulation, the Commission considers that the facilities comply with the requirements set out in Article 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities.
(16)Implementing Decision (EU) 2016/2323 should therefore be amended accordingly.
(17)The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013,
HAS ADOPTED THIS DECISION:
Article 1#
The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.
Article 2#
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
The european list of ship recycling facilities referred to in article 16 of regulation (eu) no 1257/2013
PART A — Ship recycling facilities located in a Member State
| Name of the facility | Method of recycling | Type and size of ships that can be recycled | Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management | Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authoritynote | Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facilitynote | Date of expiry of inclusion in the European Listnote |
|---|---|---|---|---|---|---|
| BELGIUM | ||||||
| NV Galloo Recycling GhentScheepszatestraat 99000 GentBelgiumPhone: +32(0)9/251 25 21Email: peter.wyntin@galloo.com | Alongside (wet berth), slope | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 265 metresWidth: 37 metresDraught: 12,5 metres | Tacit approval, with a maximum review period of 30 days | 34 000note | 31 March 2025 | |
| DENMARK | ||||||
| FAYARD A/SKystvejen 100DK-5330 MunkeboDenmarkwww.fayard.dkPhone: +45 7592 0000Email: fayard@fayard.dk | Drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 415 metresWidth: 90 metresDraught: 7,8 metres | The ship recycling facility is regulated in accordance with applicable legislation and with the conditions set out in Environmental Permit of 7 November 2018 issued by the Municipality of Kerteminde. The Environmental Permit includes conditions for operating hours, special operating conditions, handling and storage of waste and also includes a condition that the activity must be carried out in a dry dock. | Tacit approval, with a maximum review period of 14 days. | 0note | 7 November 2023 |
| Fornæs ApSRolshøjvej 12-168500 GrenaaDenmarkwww.fornaes.dkPhone: +45 86326393Email: recycling@fornaes.dk | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metresWidth: 25 metresDraught: 6 metresGT: 10000 | The municipality of Norddjurs has the right to allocate Hazardous waste for environmentally approved reception facilities. | Tacit approval, with a maximum review period of 14 days. | 30 000note | 30 June 2021 |
| Jatob ApSLangerak 129900 FrederikshavnDenmarkwww.jatob.dkPhone: +45 8668 1689Email: post@jatob.dk mathias@jatob.dk | Alongside, slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metresWidth: 30 metresDraught: 6 metres | Handling and storage of waste fractions is given by Environmental Authorization. Intermediate storage of hazardous waste may occur for up to one year at the site. | Tacit approval, with a maximum review period of 14 days. | 13 000note | 9 March 2025 |
| Modern American Recycling Services Europe (M.A.R.S)Sandholm 609900 FrederikshavnDenmarkwww.modernamericanrecyclingservices.com/Email: kim@mars-eu.dk | Slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 290 metres Width: 90 metresDraught: 14 metres | The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 issued by the Municipality of FrederikshavnThe Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility.The facility must not store hazardous waste for more than one year. | Tacit approval, with a maximum review period of 14 days. | 0note | 23 August 2023 |
| Smedegaarden A/SVikingkaj 56700 EsbjergDenmarkwww.smedegaarden.net | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 170 metresWidth: 40 metresDraught: 7,5 metres | Tacit approval, with a maximum review period of 14 days | 20 000note | 15 September 2021 | |
| Stena Recycling A/SGrusvej 66700 EsbjergDENMARKPhone: +45 20699190Website:www.stenarecycling.dkEmail:jakob.kristensen@stenarecycling.com | Drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.Maximum ship dimensions:Length: 40 metres Width: 40 metresDraught: 10 metres | The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 5 October2017 issued by Esbjerg Municipality.Esbjerg Municipality has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility | Tacit approval, with a maximum review period of 14 days | 0note | 7 February 2024 |
| ESTONIA | ||||||
| BLRT Refonda Baltic OÜKopli 103, 11712 Tallinn,EstoniaPhone: +372 610 2933Fax +372 610 2444Email: refonda@blrt.eewww.refonda.ee | Afloat at the quayside and in the floating dock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 197 metresWidth: 32 metresDraught: 9,6 metresGT: 28000 | Waste permit No. L.JÄ/327249. Hazardous waste management licence No 0222. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13The facility can recycle only the hazardous materials for which it has been licensed. | Tacit approval, with a maximum review period of 30 days. | 21 852note | 15 February 2021 |
| SPAIN | ||||||
| DDR VESSELS XXI, S.L.Port of “El Musel”GijonSpainPhone: +34 630 14 44 16Email: abarredo@ddr-vessels.es | Dismantling ramp | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.Maximum ship dimensions:Length: 169,9 metres(Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study) | The limitations are included in the integrated environmental authorisation. | Explicit approval – The competent authority for the approval decision is the Harbour Masters Office | 0note | 28 July 2025 |
| FRANCE | ||||||
| Démonaval RecyclingZI du MalaquisRue François Arago76580 LE TRAITPhone: (+ 33) (0)7 69 79 12 80Email:patrick@demonaval-recycling.fr | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 140 metresWidth: 25 metresDepth: 5 metres | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment | 0note | 11 December 2022 |
| GARDET & DE BEZENAC Recycling /Groupe BAUDELETENVIRONNEMENT – GIE MUG616, Boulevard Jules Durand76600 Le HavreFrancePhone: +33(0)2 35 95 16 34Email:infos@gardet-bezenac.com | Floating and slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metresWidth: 18 metresDepth: 7 metresLDT: 7000 | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment. | 16 000note | 30 December 2021 |
| Grand Port Maritime de Bordeaux152, Quai de Bacalan – CS 41320 – 33082 Bordeaux CedexFrancePhone: +33(0)5 56 90 58 00Email: maintenance@bordeaux-port.fr | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 240 metresWidth: 37 metresDepth: 17 metres | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment. | 18 000note | 21 October 2021 |
| Les recycleurs BretonsZone Industrielle de Kerbriant – 29 610 PlouigneauFrancePhone: +33(0)2 98 01 11 06Email: navaleo@navaleo.fr | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 225 metresWidth: 34 metresDepth: 27 metres | Environmental limitations are defined in the prefectural authorisation. | Explicit approval – The competent authority for the approval decision is the minister of environment. | 15 000note | 19 June 2025 |
| ITALY | ||||||
| San Giorgio del Porto S.p.A.Calata Boccardo 816128 – Genova –ItalyPhone:+39 (0)10 251561Email:segreteria@sgdp.it;sangiorgiodelporto@legalmail.itwww.sgdp.it | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 350 metresWidth: 75 metresDepth: 16 metresGT: 130000 | The limitations and restrictions are included in the integrated environmental authorisation. | Explicit approval | 38 564note | 6 June 2023 |
| LATVIA | ||||||
| “Galaksis N”, Ltd.Kapsedes street 2D,Liepāja, LV – 3414LatviaPhone: +371 29410506Email: galaksisn@inbox.lv | Alongside (wet berth), drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 165 metresWidth:22 metresDepth: 7 metresGT: 12000 | See national permit No. LI12IB0053 | Explicit approval – written notification in 30 working days | 0note | 17 July 2024 |
| LITHUANIA | ||||||
| UAB APKMinijos 180 (berth 133A), LT 93269, Klaipėda,LithuaniaPhone: +370 (46) 365776Fax +370 (46) 365776Email: uab.apk@gmail.com | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 130 metresWidth: 35 metresDepth: 10 metresGT: 3500 | See national permit No. TL-KL.1-15/2015 | Explicit approval – written notification in 30 working days | 1 500note | 12 March 2025 |
| UAB ArmarMinijos 180 (berth 131A), LT 93269, Klaipėda,LithuaniaPhone: +370 685 32607Email: armar.uab@gmail.com; albatrosas33@gmail.com | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 80 metresWidth: 16 metresDepth: 5 metresGT: 1500 | See national permit No. TL-KL.1-51/2017 | Explicit approval – written notification in 30 working days | 3 910note | 19 April 2022 |
| UAB DemeksaNemuno g. 42A (berth 121), LT 93277 KlaipėdaLithuaniaPhone: +370 630 69903Email: uabdemeksa@gmail.com | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 58 metres;Width: 16 metres;Depth: 5 metres;GT: 3500 | See national permit No. TL-KL.1-64/2019 | Explicit approval – written notification in 30 working days | 0note | 22 May 2024 |
| UAB Vakarų refondaMinijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda,LithuaniaPhone: +370 (46) 483940/483891Fax +370 (46) 483891Email: refonda@wsy.lt | Alongside (wet berth) | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 230 metresWidth: 55 metresDepth: 14 metresGT: 70000 | See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 | Explicit approval – written notification in 30 working days | 20 140note | 30 April 2025 |
| THE NETHERLANDS | ||||||
| Damen Verolme Rotterdam B.V.Prof. Gerbrandyweg 253197 KK Rotterdam-BotlekThe NetherlandsPhone: +31 18 123 43 53Email: praveen.badloo@damen.com | Drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 405 metresWidth: 90 metresDepth: 11,6 metres | The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. | Explicit approval | 52 000note | 21 July 2021 |
| Sagro Aannemingsmaatschappij Zeeland B.V.Estlandweg 104455 SV NieuwdorpThe NetherlandsPhone: +31 113351710Email: slf@sagro.nl | Preparatory actions along the quayside, lifted onshore for scrapping | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 120 metresWidth: 20 metresDepth: 6 metres | The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. | Explicit approval | 15 000note | 28 March 2024 |
| Scheepssloperij Nederland B.V.Havenweg 1; 3295 XZ 's-GravendeelPostbus 5234; 3295 ZJ 's-GravendeelThe NetherlandsPhone: +31 78 673 60 55Email: info@sloperij-nederland.nl | Wet mooring and slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 200 metresWidth: 33 metresDepth: 6 metresHeight: 45 metres (Botlekbridge) | The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.Preparatory actions take place along the quayside, until the hull can be towed onto the slipway using a winch which has a pulling capacity of 2000 tonnes. | Explicit approval | 9 300note | 27 September 2021 |
| NORWAY | ||||||
| ADRS Decom GulenFacility address:Sløvågen 2,5960 Dalsøyra,NorwayOffice address:Statsminister Michelsens vei 38,5230 Paradis,Norwayhttps://adrs.no/ | Alongside, slipway, dry/wet-dock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013.Maximum ship dimensions:Length: 360 metresWidth: No limitDepth: No limit | See national permit No 2019,0501.T | Explicit approval | 0note | 1 October 2024 |
| AF Offshore DecomRaunesvegen 597,5578 Nedre VatsNorwayhttps://afgruppen.no/selskaper/af-offshore-decom/ | Alongside | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 290 metresWidth: no limitDepth: no limit | See national permit No 2005,0038.T | Explicit approval | 31 000note | 28 January 2024 |
| Green Yard ASAngholmen,4485 Feda,Norwaywww.greenyard.no | Drydock (indoors), slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 230 metresWidth: 25 metresDepth: 20 metres | See national permit No 2018,0833.TMajor dismantling operations must be performed indoors.The only dismantling and cutting operations that are allowed outside in open air are minor operations necessary to fit ships to the indoor facility. See permit for further details. | Explicit approval | 0note | 28 January 2024 |
| Fosen Gjenvinning ASStokksundveien 1432,7177 RevsnesNorwayPhone: +47 400 39 479Email: knut@fosengjenvinning.no | Alongside | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigs or vessels used for extracting hydrocarbonsMaximum ship dimensions:Length: 150 metresWidth: 20 metresDepth: 7 metres | See national permit No 2006,0250.T | Explicit approval | 8 000note | 9 January 2024 |
| Kvaerner AS (Stord)Eldøyane 59,5411 Stord,Norwaywww.kvaerner.com | Alongside (wet berth), slipway | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 230 metresWidth: No limitDepth: No limit | See national permit No 2013,0111.T | Explicit approval | 43 000note | 28 January 2024 |
| Lutelandet IndustrihamnLutelandet Offshore AS6964 Korssund,Norwaywww.lutelandetoffshore.com | Alongside | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: No limitWidth: No limitDepth: No limit | See national permitNo 2014,0646.T | Explicit approval | 14 000note | 28 January 2024 |
| Norscrap West ASHanøytangen 122,5310 Hauglandhella,Norwaywww.norscrap.no | Alongside, floating slipway, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 150 metresWidth: 34 metresDepth: no limit | See national permit No 2017,0864.TMaximum 8000 LDT on floating slipway. Ships exceeding 8000 LDT need to be reduced prior to pulling in the slipway | Explicit approval | 4 500note | 1 March 2024 |
| PORTUGAL | ||||||
| Navalria – Docas, Construções e Reparações NavaisPorto Comercial, Terminal Sul, Apartado 39, 3811-901 AveiroPortugalPhone: +351 234378970, +351 232767700Email: info@navalria.pt | Drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 104 metresWidth: 6,5 metresDraught: 6,5 metres | Conditions applied to the activity are defined in specifications annexed to Title AL n° 5/2015/CCDRC of 26 January 2016.Decontamination and dismantling take place on a horizontal plane and inclined plane, according to the ship’s size. The horizontal plane has a nominal capacity of 700 tonnes. The inclined plane has a nominal capacity of 900 tonnes. | Explicit approval | 1 900note | 26 November 2020 |
| FINLAND | ||||||
| Turun Korjaustelakka Oy (Turku Repair Yard Ltd)Navirentie, 21110 NaantaliFinlandPhone: +358 2 44 511Email: try@turkurepairyard.com | Alongside, drydock | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 250 metresWidth: 40 metresDraught: 7,9 metres | The limitations are included in the national environmental permit. | Explicit approval | 20 000note | 1 October 2023 |
| UNITED KINGDOM | ||||||
| Able UK LimitedTeesside Environmental Reclamation and Recycling CentreGraythorp DockTees RoadHartlepoolClevelandTS25 2DBUnited KingdomPhone: +44(0)1642 806080Email: info@ableuk.com | Wet berth | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 337,5 metresWidth: 120 metresDraught: 6,65 metres (9,5 m when dredged) | The site is authorised by way of a permit (Reference EPR/VP3296ZM) that limits the operations and places conditions on the operator of the facility. | Explicit approval | 95 490note | 31 December 2020 |
| Dales Marine Services LtdImperial Dry DockLeithEdinburghEH6 7DRPhone:+44(0)131 454 3380Email:leithadmin@dalesmarine.co.uk; b.robertson@dalesmarine.co.uk | Dry dock and wet berth | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 165 metresWidth: 21 metresDraught: 7,7 metres | The site is authorised by way of a licence (Ref: WML L 1157331) that limits the operations and places conditions on the operator of the facility. | Explicit approval | 7 275note | 31 December 2020 |
| Harland and Wolff (Belfast) LtdQueen’s IslandBelfastBT3 9DUPhone +44(0)2890534189Fax +44(0)2890458515Email Eoghan.Rainey@harland-wolff.com | Dry dock and wet berth | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 556 metresWidth: 93 metresDraught: 7,5 metresDWT: 550000 | The site is authorised by way of a waste management licence, authorisation number LN/20/11 that limits the operations and places conditions on the operator of the facility. | Explicit approval | 12 000note | 16 June 2025 |
PART B — Ship recycling facilities located in a third country
| Name of the facility | Method of recycling | Type and size of ships that can be recycled | Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management | Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authoritynote | Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facilitynote | Date of expiry of inclusion in the European Listnote |
|---|---|---|---|---|---|---|
| TURKEY | ||||||
| Avsar Gemi Sokum San. Dis Tic. Ltd. Sti.Gemi Söküm Tesisleri,Parcel 5 Aliağaİzmir 35800,TurkeyPhone: +90 232 618 21 07 – 08 – 09Email: info@avsargemiltd.com | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, with the exception of rigsMaximum ship dimensions:Length: no limitWidth: 50 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 54 224note | 2 December 2025 |
| Isiksan Gemi Sokum Pazarlama Ve Tic. Ltd. Sti.Gemi Söküm Tesisleri,Parcel 22 Aliağaİzmir 35800,TurkeyPhone: +90 232 618 21 65Email: info@isiksangemi.com | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 75 metresDraught: 17 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalonedocument. | 91 851note | 7 July 2024 |
| EGE CELIK SAN. VE TIC. A.S.Gemi Söküm Tesisleri,Parcel 10 Aliağa,Izmir 35800,TurkeyPhone: +90 232 618 21 62Email: pamirtaner@egecelik.com | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 50 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 55 503note | 12 February 2025 |
| LEYAL GEMİ SÖKÜM SANAYİ ve TİCARETLTD.Gemi Söküm Tesisleri,Parcel 3-4 Aliağa,Izmir 35800,TurkeyPhone: +90 232 618 20 30Email: info@leyal.com.tr | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 100 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 55 495note | 9 December 2023 |
| LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.Gemi Söküm Tesisleri,Parcel 25 Aliağa,Izmir 35800,TurkeyPhone: +90 232 618 20 65Email: demtas@leyal.com.tr | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 63 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship.The SRP is neither explicitly approved nor rejected as a standalonedocument. | 50 350note | 9 December 2023 |
| ÖGE GEMİ SÖKÜM İTH. İHR. TİC. SAN.AŞ.Gemi Söküm Tesisleri,Parcel 23 Aliağa,Izmir 35800,TurkeyPhone: +90 232 618 21 05Email: oge@ogegemi.comwww.ogegemi.com | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 70 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 62 471note | 12 February 2025 |
| Simsekler Gida Gemi Sokum Insaat Sanayi Tic. Ltd.StiGemi Söküm Tesisleri,Parcel 11-12 Aliağa,Izmir 35800,TurkeyPhone: +90 232 618 20 36Email: shipyard@simseklergroup.com.tr | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 95 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalone document. | 51 569note | 2 December 2025 |
| Sök Denizcilik Tic. Ltd. StiGemi Söküm Tesisleri,Parcel 8-9 Aliağa,Izmir 35800,TurkeyPhone: +90 232 618 2092Email: info@sokship.com | Landing | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: no limitWidth: 90 metresDraught: 15 metres | The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning. | Tacit approvalThe ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship. The SRP is neither explicitly approved nor rejected as a standalonedocument. | 66 167note | 12 February 2025 |
| UNITED STATES OF AMERICA | ||||||
| International Shipbreaking Limited L.L.C18601 R.L Ostos Road Brownsville TX, 78521United StatesPhone: 956-831-2299Email: chris.green@internationalshipbreaking.comrobert.berry@internationalshipbreaking.com | Alongside (wet berth), slope | Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013Maximum ship dimensions:Length: 366 metres Width: 48 metres Draught: 9 metres | The conditions under which the facility is authorised to operate are defined in permits, certificates and authorisations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard.The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million.The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp. | There is currently no procedure in US law related to the approval of ship recycling plans | 120 000note | 9 December 2023 |
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.