law://eu/dec/2019/62@2026-11-14THE EUROPEAN COMMISSION,Having regard to the Treaty on the Functioning of the European Union,Having regard to Regulation (EC) No 1221/2009 of the European Parliament and of the Council of 25 November 2009 on the voluntary participation by organisations in a Community eco-management and audit scheme (EMAS), repealing Regulation (EC) No 761/2001 and Commission Decisions 2001/681/EC and 2006/193/ECnote, and in particular Article 46(1) thereof,Whereas:
HAS ADOPTED THIS DECISION:
| Main environmental aspect | Relatedenvironmental pressure | BEMPs | ||||
|---|---|---|---|---|---|---|
| Energy/climate change | Resources/waste | Water | Emissions | Biodiversity | ||
| Supply chain management | BEMPs on supply chain management (Section 3.6) | |||||
| Engineering and design | BEMP on design for sustainability (Section 3.6.3)BEMP on remanufacturing of components (Section 3.7.1) | |||||
| Manufacturing and assembly stage | ||||||
| Press shop | Reference to the BEMPs for the Fabricated Metal Products manufacturing sectornoteBEMPs for environmental, energy, waste, water and biodiversity management (Sections 3.1, 3.2, 3.3, 3.4, 3.5) | |||||
| Body-in-white | BEMPs for environmental, energy, waste, water and biodiversity management (Sections 3.1, 3.2, 3.3, 3.4, 3.5) | |||||
| Paint shop | Reference to BAT in BREFs for STS, STM | |||||
| Manufacture of powertrain and chassis | Reference to the BEMPs for the Fabricated Metal Products manufacturing sectorBEMPs for environmental, energy, waste, water and biodiversity management (Sections 3.1, 3.2, 3.3, 3.4, 3.5) | |||||
| Manufacture of other components | Reference to BAT in BREFs for FMP, SF, IS, TAN, GLS, POL, TXT etc.Reference to the BEMPs for the EEE manufacturing sectornote | |||||
| Assembly lines | BEMPs for environmental, energy, waste, water and biodiversity management (Sections 3.1, 3.2, 3.3, 3.4, 3.5) | |||||
| Plant infrastructure | BEMPs for environmental, energy, waste, water and biodiversity management (Sections 3.1, 3.2, 3.3, 3.4, 3.5) | |||||
| Use phase | Out of scope, see Figure 1 | |||||
| End-of-life Vehicles (ELVs) stage | ||||||
| Depollution | Reference to Directives 2000/53/EC and 2006/66/EC of the European Parliament and of the CouncilnoteBEMP on implementing an advanced environmental management system (Section 3.1.1)BEMP on enhanced depollution of vehicles (Section 4.2.1) | |||||
| Salvage and reuse | Directives 2000/53/EC and 2006/66/EC (see references above)BEMP on implementing an advanced environmental management system (Section 3.1.1)BEMP on component and material take-back networks (Section 4.1.1) | |||||
| Dismantling and recycling of components | Directives 2000/53/EC and 2006/66/EC (see references above)BEMP on implementing an advanced environmental management system (Section 3.1.1)BEMP on plastic and composite parts (Section 4.2.2) | |||||
| Post-shredder treatment | Out of scope (Reference to BAT in the BREF for WT), see Figure 1 |
| Area | Key aspect | Stakeholders | ||||||
|---|---|---|---|---|---|---|---|---|
| OEMsnote | Tier 1 suppliers | Tier 2 & other suppliers | Remanufacturers | ATFsnote | Shredders | |||
| MANUFACTURING | CROSS CUTTING MANUFACTURING | Environmental management | X | X | X | X | X | (x) |
| Energy management | X | X | X | X | X | (x) | ||
| Waste management | X | X | X | X | X | (x) | ||
| Water management | X | X | X | X | X | (x) | ||
| Biodiversity | X | X | X | X | X | (x) | ||
| SUPPLY CHAIN, DESIGN, AND REMANUFACTURING | Supply Chain Management, logistics and design | X | X | X | ||||
| Remanufacturing | (x) | X | ||||||
| END OF LIFE VEHICLE HANDLING | ELV logistics | Collection | (x) | X | ||||
| ELV treatment | X | (x) |
| Environmental performance indicators | Benchmark of excellence |
|---|---|
| (i1) Sites with an advanced environmental management system (% of facilities/operations)(i2) Number of environmental performance indicators that are in general use throughout the whole organisation and/or which are reported on in environmental statements;(i3) Use of internal or external benchmarks to drive environmental performance (Y/N) | (b1) An advanced environmental management system is implemented across all production sites globally |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i4) Number of facilities with detailed energy monitoring systems (# or % of facilities/operations)(i5) Number of facilities with an energy management system certified ISO 50001 or integrated in EMAS (# or % of facilities/operations) | (b2) Specific energy management plans are implemented across all sites (organisation level)(b3) Detailed monitoring per process is implemented on-site (site level)(b4) The plant implements energy management controls, e.g. to switch off areas of the plant during non-productive times for sites with detailed monitoring (site level) |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i6) Implementation of regular reviews of systems, automation, repair, maintenance and upgrades (% of sites)(i7) Overall energy use (kWh) per functional unit | — |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i8) Share of production sites assessed for potential and opportunities for use of renewable energy sources (%)(i9) Share of site energy use met by renewable sources (%)(i10) Energy consumption from fossil fuels (MWh or TJ) per functional unit | (b5) All production sites are assessed for potential use of renewable energy sources(b6) Energy use is reported, declaring the share of fossil and non-fossil energy(b7) A policy is in place to drive an increase in renewable energy use |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i11) Implementation of improved positioning, energy-efficient lighting (% of lighting areas within a site, % of total sites).(i12) Implementation of zonal strategies for lighting (% of lighting areas within a site, % of total sites).(i13) Energy use of lighting equipment (kWh/year for a plant)(i14) Average efficacy of luminaires throughout plant (lm/W) | (b8) The most energy efficient lighting solutions appropriate to specific work place requirements are implemented at all sites(b9) Zoning schemes are introduced in all sites |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i15) Electricity use of the compressed air system per unit of volume at the point of end use (kWh/m3 of delivered compressed air) | (b10) The energy use of the compressed air system is lower than 0,11 kWh/m3 of compressed air delivered, for large installations operating at a gauge pressure of 6,5 bar, with volume flow normalised at 1013 mbar and 20 oC, and pressure deviations not exceeding 0,2 bar.(b11) After all air consumers are switched off, the network pressure remains stable and the compressors (on standby) do not switch to load condition. |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i16) Share of electric motors with VSD installed (% of total installed power or of total number)(i17) Share of pumps with VSD installed (% of total installed power or of total number)(i18) Average pump efficiency (%) | — |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i19) Waste generation per functional unit (kg/functional unit)(i20) Hazardous waste generation per functional unit (kg/functional unit)(i21) Waste sent to specific streams, including recycling, energy recovery and landfill (kg/functional unit, % total waste).(i22) Establishment and implementation of an overarching waste strategy with monitoring and targets for improvements (Y/N)(i23) [For multi-site organisations] Number of sites with advanced waste management plans in place (#)(i24) [For multi-site organisations] Number of sites achieving zero waste to landfill (#) | (b12) Waste management plans introduced [in all sites](b13) Zero waste sent to landfill from all production and non-production activities/sites |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i25) Water use per functional unit (m3/functional unit)(i26) Sites that have conducted a water strategy review (% of facilities/operations)(i27) Sites that have monitoring for water use (%)(i28) Sites that have separate water monitoring for production processes and sanitary use (%) | (b14) Introduction of a water strategy according to a recognised tool, such as the CEO Water Mandate, integrating an assessment of water scarcity(b15) Water use on-site is measured per site and per process, if appropriate, using automated software |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i25) Water use per functional unit (m3/functional unit)(i29) Share of operations in existing sites retrofitted with water-saving sanitary devices and processes (%)(i30) Share of new sites designed with water-saving devices and processes (%) | (b16) All new sites are designed with water-saving sanitary devices and retrofitting of water-saving devices is phased in across all existing sites |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i25)Water use per functional unit (m3/functional unit)(i31)Installation of a wastewater recycling system (Y/N)(i32)Installation of a rainwater recycling system (Y/N)(i33)Yearly quantity of rainwater use and wastewater reuse (m3/yr)(i34)Percentage of total water use met by recycled rain- or wastewater (%). | (b17)‘Closed loop’ water recycling is implemented with recovery rate of at least 90 % where feasible(b18)30 % water needs are met by harvested water (in regions with sufficient rainfall) |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i35) Percentage of sites that are suitable for green roofs with green roofs installed (%)(i36) Water holding capacity of the green roof: share of water retention (%), water run off (m3);(i37) Cooling effect: reduction in energy demand for HVAC (MJ);(i38) Qualitative biodiversity indicators (e.g. number of species living in the roof), depending on local conditions. | — |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i39) Application of methodologies to assess ecosystem services to the value chain (Y/N or % coverage);(i40) Coverage of relevant scope, as determined by prioritisation (Y/N or % coverage). | (b19) A high-level ecosystem review is conducted across the value chain, followed by a more detailed ecosystem review in identified high risk areas(b20) Strategies to mitigate issues in the identified priority areas of the supply chain are developed, in collaboration with local stakeholders and external experts |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i41) Number of collaboration projects with stakeholders to address biodiversity issues (#)(i42) Procedure/instruments are in place to analyse biodiversity related feedback from customers, stakeholder, suppliers (Y/N).(i43) Inventory of land or other areas, owned, leased or managed by the company in or adjacent to protected areas or areas of high biodiversity value (m2).(i44) Plan for biodiversity friendly gardening in place for premises or other areas, owned, leased or managed by the company (Y/N).(i45) Biodiversity Index (to be developed according to local conditions) | (b21) A comprehensive biodiversity plan is in place to ensure systematic incorporation of biodiversity issues through measurement, monitoring and reporting(b22) Cooperation with experts and local stakeholders is in place |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i46) Share of Tier 1 (direct) suppliers (by number or by purchasing budget/value) that comply with required standards according to internal or external audits (%)(i47) Self-assessment questionnaires sent to direct high risk suppliers (Y/N)(i48) Direct supplier development and training undertaken (Y/N) | (b23) All major suppliers are required to have an environmental management system in order to qualify for purchasing agreements(b24) Environmental criteria are set across all environmental impact areas for purchasing agreements(b25) All direct suppliers are sent self-assessment questionnaires and high risk suppliers are audited by customers or third parties(b26) Direct supplier development and training is undertaken(b27) Enforcement procedures are defined for non-compliance |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i20) Waste generation per functional unit (kg/functional unit)(i49) Packaging waste generation per functional unit (kg/functional unit)(i50) Packaging waste generation per site or maintenance group (kg/site, kg/maintenance group) | — |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i51) Conducting LCA of the main product lines to support design and development decisions (Y/N)(i52) Improvements in environmental indicators (CO2, energy consumption, pollution etc.) for new model designs in the main product lines compared to previous model designs (%)(i53) Conduct comparisons among different kinds of mobility concepts (Y/N) | (b28) LCA is conducted for main product lines according to ISO 14040:2006 standards or equivalent(b29) Targets are set to ensure continuous improvements in the environmental impacts of new vehicle designs |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i54) Level of remanufacturing (weight per component (%))(i55) Overall remanufacturing levels (% of recovered components). | — |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i56) Rate of specific products or materials recuperated through ELV networks (%) | (b30) Collaboration and partnerships are in place with local/national organisations to implement take-back networks |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i57) Removal rate of components (%)(i58) Recycling rate of fluids (%)(i59) Installation of commercial depollution machine or equally performing equipment (Y/N)(i60) Use of mass balancing techniques to monitor depollution rates (Y/N)(i61) Adoption of a quality management system (Y/N) | (b31) A certified quality management system is in place in the organisation |
| Environmental performance indicators | Benchmarks of excellence |
|---|---|
| (i62) Consideration of LCA studies to determine optimal material routes according to local factors (Y/N)(i63) Share of components treated according to optimal LCA route (%) | — |
| # | Recommended Indicator | Common Unit | Main target group | Short description | Recommended minimum level of monitoring | Related EMAS core indicatornote | Benchmark of excellence | Related Best Environmental management Practicenote |
|---|---|---|---|---|---|---|---|---|
| CAR MANUFACTURING | ||||||||
| 1 | Sites with an advanced environmental management system | % of facilities/operations | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Number of sites with an advanced environmental management system (e.g. EMAS registered or ISO 14001 certified and as described in the BEMP) divided by the total number of sites | Company level | Energy efficiencyMaterial efficiencyWaterWasteBiodiversityEmissions | An advanced environmental management system is implemented across all production sites globally | BEMP 3.1.1 |
| 2 | Number of facilities with detailed energy monitoring systems | # of facilities/operations% of facilities/operations | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Number of facilities with adequate energy monitoring systems. This can be also expressed as a share out of the total number of facilities of the company | Company level | Energy efficiency | Specific energy management plans are implemented across all sitesDetailed monitoring per process is implemented on-siteThe plant implements energy management controls, e.g. to switch off areas of the plant during non-productive times for sites with detailed monitoring | BEMP 3.2.1 |
| 3 | Overall energy use per functional unit | kWh/functional unit/year | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Yearly energy (heat, cold and electricity) used in the production site divided by the functional unit selected (e.g. car vehicles manufactured) | Company level | Energy efficiency | — | BEMP 3.2.2 |
| 4 | Share of production sites assessed for potential and opportunities for use of renewable energy sources | % | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Production sites assessed for potential and opportunities for use of renewable energy sources divided by the total number of production sites | Company level | Emissions | All production sites are assessed for potential and opportunities for use of renewable energy sourcesA policy is in place to drive improvement in renewable energy use | BEMP 3.2.3 |
| 5 | Share of site energy use met by renewable energy | % | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Amount of renewable energy used (including both energy generated onsite or purchased) divided by the total energy used on site. | Company level | Emissions | Energy use is reported on, declaring the share of fossil and non-fossil energy | BEMP 3.2.3 |
| 6 | Energy use of lighting equipment | kWh/year | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Annual energy use for lighting measured at facility level | Facility level | Energy efficiencyEmissions | — | BEMP 3.2.4 |
| 7 | Implementation of improved positioning, energy efficient lighting | % of lighting areas within a site% of total sites | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Improved positioning and energy-efficient lighting systems are implemented at the facility | Facility level | Energy efficiencyEmissions | The most energy efficient lighting solutions appropriate to specific work place requirements are implemented at all sites | BEMP 3.2.4 |
| 8 | Implementation of zonal strategies for lighting | % of lighting areas within a site% of total sites | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Management of lighting is implemented on a ‘zonal’ basis, i.e. with lighting switched on or off according to requirements and presence in each area of the facility | Facility level | Energy efficiencyEmissions | Zoning schemes are introduced in all sites according to best practice levels | BEMP 3.2.4 |
| 9 | Electricity use of the compressed air system per unit of volume at the point of end use | kWh/Nm3 of delivered compressed air, at the specified operating pressure of the compressed air system | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Electricity used per standard cubic meter of compressed air delivered at the point of end-use at a stated pressure level | Facility level | Energy efficiencyEmissions | The compressed air system has an energy use of less than 0,11 kWh/Nm3 for a compressed air system operating at a pressure of approx. 6,5 bars | BEMP 3.2.5 |
| 10 | Share of electric motors with variable speed drives installed | % | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Number of motors with variable speed drives installed divided by the total number of motors.Alternatively, this indicator can also be calculated by the electric power of the motors with variable speed drives installed divided by the total electric power of all electric motors. | Facility level | Energy efficiencyEmissions | — | BEMP 3.2.6 |
| 11 | Waste generation per functional unit | kg/functional unit | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Total waste generated (i.e. hazardous and non-hazardous) divided by the functional units selected (e.g. car vehicles manufactured) | Facility level | Waste | — | BEMP 3.2.7 |
| 12 | Establishment and implementation of an overarching waste strategy with monitoring and targets for improvements | Y/N | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | A waste management strategy at site level with monitoring and targets for improvements is adopted | Facility level | Waste | Waste management plans introduced [in all sites] | BEMP 3.3.1 |
| 13 | Waste sent to specific streams, including recycling, energy recovery and landfill | kg/functional unit | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Waste generated is monitored and the different quantities sent for recycling, energy recovery and disposal in landfill are recorded | Facility level | Waste | Zero waste sent to landfill from all production and non-production activities/sites | BEMP 3.3.1 |
| 14 | Water use per functional unit | L/functional unit | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Total water used at the single facility level divided by the functional units selected (e.g. car vehicles manufactured) | Facility level | Water | Introduction of a water strategy according to a recognised tool, such as the CEO Water Mandate, integrating an assessment of water scarcityWater use on-site is measured per site and per process, optionally using automated softwareThresholds for reduction of pollutants in discharged water are set which go beyond minimum legal requirements | BEMPs 3.4.1, 3.4.2, 3.4.3 |
| 15 | Share of operations in existing sites retrofitted with water-saving devices and processes | % | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Number of operations in existing sites that are retrofitted with water-saving devices and processes out of the total number of operations | Facility level | Water | All new sites are designed with water-saving sanitary devices and retrofitting of water-saving devices is phased in across all existing sites | BEMP 3.4.2 |
| 16 | Share of new sites designed with water-saving devices and processes | % | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Number of new sites designed with water-saving devices and processes out of the total number of new sites | Facility level | Water | All new sites are designed with water-saving sanitary devices and retrofitting of water-saving devices is phased in across all existing sites | BEMP 3.4.2 |
| 17 | Percentage of total water use met by recycled rain- or wastewater | % | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | Amount of water used in the facility which is water recycled in production processes or rainwater harvested from a rainwater harvesting system | Facility level | Water | Closed loop water recycling is implemented with recovery rate of at least 90 %, where feasible30 % of water used are met by harvested rainwater, only in regions with sufficient rainfall | BEMP 3.4.3 |
| 18 | Application of methodologies to assess ecosystem services to the value chain | Y/N% coverage of value chain | Automotive vehicles, parts and components manufacturers | An assessment of the ecosystem services to the value chain is applied.Additionally, the share of the value chain for which an assessment of the ecosystem services is applied, can be calculated | Company level | Biodiversity | A high-level ecosystem review across the value chain is conducted, followed by a more detailed ecosystem review in identified high risk areasStrategies to mitigate issues in the identified priority areas of the supply chain are developed, in collaboration with local stakeholders and external experts | BEMP 3.5.1 |
| 19 | Number of projects or collaborations with stakeholders to address biodiversity issues | # | Automotive vehicles, parts and components manufacturersAuthorised end-of-life vehicle treatment facilities | The number of different collaboration projects with local stakeholders and experts involved in addressing biodiversity that are in place can be monitored | Facility level | Biodiversity | A comprehensive biodiversity plan is in place to ensure systematic incorporation of biodiversity issues through measurement, monitoring and reportingCooperation with experts and local stakeholders is in place | BEMP 3.5.2 |
| 20 | Share of Tier 1 (direct) suppliers that comply with required standards according to internal or external audits | % | Automotive vehicles, parts and components manufacturers | Percentage (by number or by value of products purchased) of Tier 1 (direct) suppliers that comply with required standards according to internal or external audits | Company level | Energy efficiencyMaterial efficiencyWaterWasteBiodiversityEmissions | All major suppliers are required to have an environmental management system in order to qualify for purchasing agreementsEnvironmental criteria are set across all environmental impact areas for purchasing agreementsAll direct suppliers are sent self-assessment questionnaires and high risk suppliers are audited by third partiesDirect supplier development and training is undertakenEnforcement procedures are defined for non-compliance | BEMP 3.6.1 |
| 21 | Packaging waste generation per functional unit | Kg/functional unit | Automotive vehicles, parts and components manufacturers | Packaging waste generated divided by the functional units selected (e.g. car vehicles manufactured) | Facility level | Waste | — | BEMP 3.6.2 |
| 22 | Conducting LCA of the main product lines to support design and development decisions | Y/N | Automotive vehicles, parts and components manufacturers | LCA is carried out on the main product lines to support design and development decisions | Company level | Energy efficiencyMaterial efficiencyWaterWasteBiodiversityEmissions | LCA is conducted for main product lines according to ISO 14040:2006 standards or equivalent | BEMP 3.6.3 |
| 23 | Improvements in environmental indicators (CO2, energy consumption, pollution, etc.) for new model designs in the main product lines compared to previous model designs | % | Automotive vehicles, parts and components manufacturers | Improvements in environmental indicators (CO2, energy consumption, pollution etc.) are set for new model designs in the main product lines compared to previous model designs. This indicator monitors how much different indicators for the product were improved | Company level | Energy efficiencyMaterial efficiencyWaterWasteBiodiversityEmissions | Targets are set to ensure continuous improvements in the environmental impacts of new vehicle designs | BEMP 3.6.3 |
| END-OF-LIFE VEHICLE HANDLING | ||||||||
| 24 | Rate of specific products or materials recuperated through ELV networks | %(product or material extracted/put on the market) | Authorised end-of-life vehicle treatment facilities | Amount of specific products or materials recuperated through ELV networks divided by the total quantity of materials from ELVs processed | Company level | WasteMaterial efficiency | Collaboration and partnerships are in place with local/national organisations | BEMP 4.1.1 |
| 25 | Adoption of a quality management system | Y/N | Authorised end-of-life vehicle treatment facilities | A certified quality management system is in place in the organisation treating end-of-life vehicles | Company level | WasteMaterial efficiency | A certified quality management system is in place in the organisation | BEMP 4.2.1 |
| 26 | Installation of a commercial depollution machine or equally performing equipment | Y/N | Authorised end-of-life vehicle treatment facilities | A commercial depollution machine or an equally performing equipment is installed at the facility | Facility level | Total annual generation of waste | — | BEMP 4.2.1 |
| 27 | Consideration of LCA studies to determine optimal material routes according to local factors | Y/N | ATFs | LCA studies are used to determine optimal materials routes (dismantling and recycling of components vs. post-shredder recycling), according to local factors | Company level | Energy efficiencyMaterial efficiencyWaterWasteBiodiversityEmissions | — | BEMP 4.2.2 |
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.