3Article 9 (‘Metering’) of Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC (OJ 2012 L 315, p. 1) provides:1.Member States shall ensure that, in so far as it is technically possible, financially reasonable and proportionate in relation to the potential energy savings, final customers for electricity, natural gas, district heating, district cooling and domestic hot water are provided with competitively priced individual meters that accurately reflect the final customer’s actual energy consumption and that provide information on actual time of use.Such a competitively priced individual meter shall always be provided when:(a) an existing meter is replaced, unless this is technically impossible or not cost-effective in relation to the estimated potential savings in the long term;(b) a new connection is made in a new building or a building undergoes major renovations, as set out in Directive 2010/31/EU [of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings (OJ 2010 L 153, p. 13)].…3.…Where multi-apartment buildings are supplied from district heating or cooling, or where own common heating or cooling systems for such buildings are prevalent, Member States may introduce transparent rules on the allocation of the cost of thermal or hot water consumption in such buildings to ensure transparency and accuracy of accounting for individual consumption. Where appropriate, such rules shall include guidelines on the way to allocate costs for heat and/or hot water that is used as follows:(a) hot water for domestic needs;(b) heat radiated from the building installation and for the purpose of heating the common areas (where staircases and corridors are equipped with radiators);(c) for the purpose of heating apartments.’
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.