Judgment of the Court (Third Chamber)11 March 2020note(Reference for a preliminary ruling — Internal market for electricity — Directive 2009/72/EC — Transmission of electricity — Concept of transmission system operator — Regulation (EC) No 714/2009 — Interconnector — Transmission line connecting the national transmission systems of the Member States — Article 16(6) — Scope — Use of revenues resulting from the allocation of interconnection capacity — Undertaking which merely operates a cross-border high-voltage power line connecting two national transmission networks)In Case C‑454/18,REQUEST for a preliminary ruling under Article 267 TFEU from the Förvaltningsrätten i Linköping (Administrative Court, Linköping, Sweden), made by decision of 5 July 2018, received at the Court on 12 July 2018, in the proceedingsBaltic Cable ABvEnergimarknadsinspektionen,THE COURT (Third Chamber),composed of A. Prechal, President of the Chamber, K. Lenaerts, President of the Court, acting as a Judge of the Third Chamber, L.S. Rossi, J. Malenovský (Rapporteur) and F. Biltgen, Judges,Advocate General: E. Tanchev,Registrar: C. Strömholm, Administrator,having regard to the written procedure and further to the hearing on 20 June 2019,after considering the observations submitted on behalf of:– Baltic Cable AB, by M. Wärnsby, L. Hallberg and S. Andersson, advokater,– the Energimarknadsinspektionen, by G. Morén, C. Vendel Nylander, R. Thuresson and E. Vidlund, acting as Agents,– the Spanish Government, initially by A. Rubio González, and subsequently by L. Aguilera Ruiz, acting as Agents,– the Finnish Government, by S. Hartikainen, acting as Agent,– the European Parliament, by I. McDowell and A. Neergaard, acting as Agents,– the Council of the European Union, by A. Lo Monaco, J. Kneale and A. Norberg, acting as Agents,– the European Commission, by O. Beynet and K. Simonsson, acting as Agents,after hearing the Opinion of the Advocate General at the sitting on 14 November 2019,gives the following
Judgment
Legal context
Directive 2009/72/EC
Regulation No 714/2009
The dispute in the main proceedings and the questions referred for a preliminary ruling
Consideration of the questions referred
The first and second questions
The third question
The fourth question
The fifth question
Costs
Operative part
Source: EUR-Lex, © European Union, 1998-2026. Reuse authorised under Decision 2011/833/EU.