Contents
- Her Excellency the Governor General in Council, on the rec…
- Interpretation
- Purpose
- Overview
- Application
- End of designation
- Covered Facility
- Compliance Period
- Person Responsible
- Annual Report
- Request for Confidentiality
- Quantification
- Emission of GHGs
- Emissions Limit
- Assessment
- Records
- Verification Report
- Compensation and Compliance Units
- Recognized Units or Credits
- Transitional Provisions
- Amendments to the Environmental Administrative Monetary Penalties Regulations
- Coming into Force
- Schedule 1 Industrial Activities and Output-based Standards (Subsections 2(1) and 5(2), paragraph 8(b), section 8.1, subparagraphs 11(1)(b)(iii) and (iv), clauses 11(1)(c)(iii)(A) and (B), subsections 12(2) and (3), section 16, paragraph 17(2)(a), subsections 22(2), 31(1), 32(1) and 36(1) to (4), section 36.1, subsections 36.2(2) and 37(1), sections 38 and 41, subsections 41.1(2) and 41.2(2), sections 41.3 and 42, subsection 1(1.1) of Part 3 of Schedule 3, subparagraphs 1(2)(b)(i) and (ii) and (c)(i) of Part 3 of Schedule 3, section 1 of Part 4 of Schedule 3, sections 1 and 2 of Part 7 of Schedule 3, section 1 of Part 37 of Schedule 3 and subparagraphs 3(g)(ii) and 3(h)(iii) of Schedule 5)
- Schedule 2 Content of Annual Report on Emissions and Production (Subsection 11(1))
- Schedule 3 Quantification Requirements (Paragraphs 17(2)(a) and (b), 20(2)(a), and 31(1)(a), subparagraph 31(1)(b)(i), subsection 32(1), paragraphs 34(1)(b) and (c) and Schedule 1)
- Schedule 4 Information to Include in Application for Permit (Subsections 27(1) and 29(1))
- Schedule 5 Content of Verification Report (Section 52 and subsection 53(1)(b))
- Item | Column 1 | Column 2 | Column 3 | Column 4 | Column…
- Schedule 5 (Section 5, subsection 6(1) and section 8.1)
- Related provisions
Her Excellency the Governor General in Council, on the recommendation of the Minister of the Environment, makes the annexed Output-Based Pricing System Regulations pursuant to(a) sections 192, 193, 198 and 256 of the Greenhouse Gas Pollution Pricing Act; and(b) section 5 of the Environmental Violations Administrative Monetary Penalties Act.notenotenote
Interpretation
1Definition of facility#
2Definitions#
Purpose
Overview
4System components#
Application
5Quantification of GHGs#
End of designation
6Condition not met#
6.1Cancellation following request#
7Ceasing to be a covered facility#
7.1Requirement for partial compliance period#
Covered Facility
8Criteria — definition section 169 of Act#
8.1Remote community#
Compliance Period
9Compliance period#
Person Responsible
10Person responsible#
10.1Conclusive presumption#
Annual Report
11Content of annual report#
12Additional content – thermal energy#
13Submission of annual report#
Request for Confidentiality
15Content of request#
Quantification
Variation of General Rules
16Production of petrochemical products as a by-product#
Quantification of GHGs
17Total GHGs#
18Additional generation of electricity#
20Total emissions per unit — electricity#
21Hybrid configuration#
22Biomass — exclusion of CO2#
22.1Measuring device#
23De minimis#
25Continuous Emissions Monitoring System#
Permit To Use an Alternative Method
26Alternative method#
27Application for permit#
28Conditions of issuance#
29Application for renewal#
30Grounds for revocation#
Quantification of Production for Specified Industrial Activities
31General rule#
32Electricity generation facility#
Ratio of Heat
34Ratio of heat#
Emission of GHGs
35Calculation#
Emissions Limit
36General rule#
36.1New electricity production — gaseous fuel#
36.2Increased capacity of electricity generation#
36.3Presumption#
37Calculated output-based standard#
38Exception — steel#
39Recalculation of output-based standard#
41Electricity#
41.1New electricity production facility — gaseous fuel#
41.2Increased capacity of electricity generation#
41.3Presumption#
42Coal and electricity#
43New covered facilities#
Assessment
44Assessment of emissions against emissions limit#
Records
45Content#
46Electronic submission#
47Retention of information#
48Obligation to notify#
Verification Report
49Verification body#
50Conflict of interest#
51Facility visit#
Compensation and Compliance Units
Minister’s Intervention
53Determination#
Compensation and Issuance of Surplus Credits
54Excess emissions#
55Excess emissions charge payment#
56Minimum percentage — charge#
57Regular-rate compensation deadline#
58Compensation information#
59Surplus credits#
Errors and Omissions
61Identification by person responsible#
62Corrected report#
63Identification by the Minister#
64Change in obligations#
66Excess Surplus credits issued#
67Charge#
68Surplus credits#
69Regular-rate compensation deadline#
Remittance of Compliance Units
70Surplus credits#
71Other compliance units#
Suspension and Revocation
72Suspension — reasonable grounds#
73Revocation#
Issuance Error or Invalidity
75Application of subsection 181(1) of the Act#
Tracking System
76Accounts for participants#
77Notice of closure#
Recognized Units or Credits
78Compliance unit#
Transitional Provisions
79Subsection 12(3)#
80Application#
81Records#
82Clinker#
83Glass containers#
84High value chemicals#
85Isopropyl alcohol#
85.1Pulp and Paper#
Amendments to the Environmental Administrative Monetary Penalties Regulations
Coming into Force
93January 1, 2019#
Schedule 1 · Industrial Activities and Output-based Standards (Subsections 2(1) and 5(2), paragraph 8(b), section 8.1, subparagraphs 11(1)(b)(iii) and (iv), clauses 11(1)(c)(iii)(A) and (B), subsections 12(2) and (3), section 16, paragraph 17(2)(a), subsections 22(2), 31(1), 32(1) and 36(1) to (4), section 36.1, subsections 36.2(2) and 37(1), sections 38 and 41, subsections 41.1(2) and 41.2(2), sections 41.3 and 42, subsection 1(1.1) of Part 3 of Schedule 3, subparagraphs 1(2)(b)(i) and (ii) and (c)(i) of Part 3 of Schedule 3, section 1 of Part 4 of Schedule 3, sections 1 and 2 of Part 7 of Schedule 3, section 1 of Part 37 of Schedule 3 and subparagraphs 3(g)(ii) and 3(h)(iii) of Schedule 5)
Item | Column 1 | Column 2 | Column 3 | Column 4Industrial Activity | Units of Measurement | Output-based standard (CO2e tonnes/unit of measurement) | Applicable Part of Schedule 3Oil and Gas Production1 | Bitumen and other crude oil production — other than bitumen extracted from surface mining — by a covered facility other than a covered facility referred to in item 3 | | | (a)extraction, processing and production of light crude oil (having a density of less than 940 kg/m3 at 15°C) | barrels of light crude oil | 0.0159 | Part 1(b)extraction, processing and production of bitumen or other heavy crude oil (having a density greater than or equal to 940 kg/m3 at 15°C) | barrels of bitumen and heavy crude oil | 0.0544 | Part 12 | Upgrading of bitumen or heavy oil to produce synthetic crude oil | barrels of synthetic crude oil | 0.0408 | Part 23 | Processing of crude oil or secondary petroleum products at a covered facility that has a combined annual volume of gasoline, diesel fuel and lubricant basestock produced that is greater than 40% of its annual volume of liquid petroleum products produced | | | (a)refining of crude oil, including bitumen, heavy crude oil, light crude oil or synthetic crude oil | complexity-weighted barrels | 0.00420 | Part 3(b)production of lubricant basestock | kilolitres of lubricant basestock | 0.295 | Part 3(c)production of isopropyl alcohol | tonnes of isopropyl alcohol | calculated in accordance with section 37 of these Regulations | Part 33.1 | Surface mining of oil sands and extraction of bitumen | barrels of bitumen | 0.0266 | Part 3.14 | Processing of natural gas and production of | | | (a)pipeline-transmission-quality natural gas | 100 000 cubic metres of pipeline-transmission- quality natural gas at a temperature of 15°C and a pressure of 101.325 kPa | 10.6 | Part 4(b)natural gas liquids | cubic metres of propane and butane combined at a temperature of 15°C and at an equilibrium pressure | 0.0301 | Part 45 | Transmission of processed natural gas by a facility referred to in paragraph (b) of the definition facility in subsection 1(1) of these Regulations | Megawatt hours (MWh) | 0.393 | Part 56 | Production of hydrogen gas using steam hydrocarbon reforming or partial oxidation of hydrocarbons | Tonnes of hydrogen gas | 9.84 | Part 6Mineral Processing7 | Production of clinker and cement | | | (a)clinker | tonnes of clinker | 0.799 | Part 7(b)grey cement | tonnes of grey cement | 0.733 | Part 7(c)white cement | tonnes of white cement | calculated in accordance with section 37 of these Regulations | Part 78 | Production of lime from limestone using a kiln | | | (a)high-calcium lime | tonnes of high- calcium lime produced and lime kiln dust sold | 1.20 | Part 8(b)dolomitic lime | tonnes of dolomitic lime produced and lime kiln dust sold | calculated in accordance with section 37 of these Regulations | Part 8(c)speciality lime | tonnes of speciality lime produced | calculated in accordance with section 37 of these Regulations | Part 89 | Production of glass, including glass wool insulation, using a furnace, | | | (a)glass containers | tonnes of packed glass | 0.370 | Part 9(b)glass, other than glass containers | tonnes of glass | calculated in accordance with section 37 of these Regulations | Part 910 | Production of gypsum products that contain at least 70 weight percent of calcium sulphate dihydrate | tonnes of gypsum products that contain at least 70 weight percent calcium sulphate dihydrate | calculated in accordance with section 37 of these Regulations | Part 1011 | Production of mineral wool insulation, excluding glass wool insulation | tonnes of mineral wool insulation | calculated in accordance with section 37 of these Regulations | Part 1112 | Production of brick or other products made from clay or shale using a kiln | tonnes of brick and other products made from clay or shale using a kiln | 0.223 | Part 12Chemicals13 | Production of grain ethanol for use as fuel and secondary production of ethanol for industrial use | | | (a)ethanol to be used as fuel | kilolitres of absolute ethanol | 0.321 | Part 13(b)ethanol to be used in industrial applications | kilolitres of absolute ethanol | 0.728 | Part 1314 | Production of furnace black in any form, including pellets and powders, using thermal oxidation or thermal decomposition of hydrocarbons | tonnes of furnace black | 2.08 | Part 1415 | Production of 2-methylpenta-methylenediamine (MPMD) | tonnes of MPMD | 4.65 | Part 1516 | Production of nylon 6 or nylon 6,6, as the case may be | | | (a)resins of nylon 6 or nylon 6,6 | tonnes of nylon resins | 0.480 | Part 16(b)fibres of nylon 6 or nylon 6,6 | tonnes of nylon fibres | 0.711 | Part 1617 | Production of the following petrochemical products from petroleum and liquefied natural gas or from feedstocks derived from petroleum: | | | (a)high-value chemicals that are produced from steam cracking, including hydrogen gas, ethylene, propylene, butadiene and benzene produced from pyrolysis gas | tonnes of high-value chemicals from steam cracking | 0.652 | Part 17(b)aromatic cyclic hydrocarbons, including benzene produced from catalytic reforming | tonnes of aromatic cyclic hydrocarbons | 0.694 | Part 17(c)higher olefins | tonnes of higher olefins | 0.954 | Part 17(d)hydrocarbon solvents | tonnes of hydrocarbon solvents | 1.14 | Part 17(e)styrene | tonnes of styrene | 0.925 | Part 17(f)polyethylene | tonnes of polyethylene | 0.164 | Part 17(g)ethylene glycol with six or fewer monomer units | tonnes of ethylene glycol with six or fewer monomer units | 0.326 | Part 17Pharmaceuticals18 | Production of vaccines for human or animal use | litres of vaccine | Calculated in accordance with section 37 of these Regulations | Part 18Iron, Steel and Metal Tubes19 | Production of steel from feedstock that comes primarily from scrap iron or steel, except the production of metal ingots or the production, using a mould, of metal products of a specific shape or design to produce the intended use of which when in that form is dependent in whole or in part on its shape or design, of | | | (a)cast steel | tonnes of cast steel | 0.124 | Part 19(b)rolled steel | tonnes of rolled steel | 0.0937 | Part 1920 | Production of iron or steel from smelted iron ore or production of metallurgical coke | | | (a)production of metallurgical coke in a coke oven battery | tonnes of coke | 0.597 | Part 20(b)production of iron from smelted iron ore | tonnes of iron | 1.46 | Part 20(c)production of steel in a basic oxygen furnace | tonnes of steel | 0.164 | Part 20(d)production of steel in an electric arc furnace | tonnes of steel | Calculated in accordance with section 37 of these Regulations | Part 2021 | Production of iron ore pellets from iron ore concentrate, of | | | (a)flux pellets | tonnes of flux pellets | 0.0990 | Part 21(b)pellets other than flux pellets | tonnes of pellets other than flux pellets | 0.0560 | Part 2122 | Production of metal tubes | tonnes of metal tubes | Calculated in accordance with section 37 of these Regulations | Part 22Mining and Ore Processing23 | Smelting or refining, from feedstock that comes primarily from ore, of at least one of the following base metals: | | | (a)pyrometallurgical smelting of copper | tonnes of copper anodes | calculated in accordance with section 37 of these Regulations | Part 23(b)pyrometallurgical smelting and refining of lead | tonnes of lead and lead alloys | 2.45 | Part 23(c)pyrometallurgical smelting of zinc and lead | tonnes of zinc and lead | 0.856 | Part 23(d)pyrometallurgical smelting of nickel | tonnes of nickel matte | 0.843 | Part 23(e)hydrometallurgical refining of base metals, including nickel, copper, zinc, lead and cobalt | tonnes of base metal produced | 1.70 | Part 23(f)hydrometallurgical electrorefining of copper anodes | tonnes of copper cathodes | calculated in accordance with section 37 of these Regulations | Part 2324 | Production of potash from the mining and refining of potash ore using | | | (a)a solution mining process | tonnes of potash containing at least 90% potassium chloride | 0.232 | Part 24(b)a conventional underground mining process | tonnes of potash containing at least 90% potassium chloride | 0.0382 | Part 2424.1 | Production of evaporated salt through solution mining | tonnes of evaporated salt at a concentration of at least 99% of NaCl | 0.153 | Part 24.125 | Production by mining coal deposits | | | (a)of thermal coal | tonnes of thermal coal | calculated in accordance with section 37 of these Regulations | Part 25(b)of metallurgical coal | tonnes of metallurgical coal | 0.0499 | Part 2526 | Production of metal or diamonds from the mining and milling of ore or kimberlite | | | (a)production of iron ore | tonnes of iron in ore | 0.0169 | Part 26(b)production of uranium ore concentrate | tonnes of uranium in ore concentrate | 9.26 | Part 26(c)production of silver, platinum or palladium | kilograms of silver, platinum and palladium | Calculated in accordance with section 37 of these Regulations | Part 26(d)production of base metal ore concentrate | tonnes of base metals in ore concentrate | 0.643 | Part 26(e)production of diamonds | carats of diamond | 0.0172 | Part 26(f)production of gold | kilograms of gold | 7.71 | Part 2627 | Calcining of coal to produce char | Tonnes of char | Calculated in accordance with section 37 of these Regulations | Part 2728 | Production of activated carbon from coal | Kilograms of activated carbon | Calculated in accordance with section 37 of these Regulations | Part 28Nitrogen Fertilizers29 | Production of nitrogen-based fertilizer, including | | | (a)nitric acid by the catalytic oxidation of ammonia | tonnes of nitric acid | 0.310 | Part 29(b)anhydrous or aqueous ammonia by the steam reforming of hydrocarbons | tonnes of ammonia | 1.82 | Part 29(c)urea liquor in addition to producing anhydrous ammonia or aqueous ammonia by the steam reforming of hydrocarbons | tonnes of urea liquor | 0.132 | Part 29(d)ammonium phosphate in addition to producing anhydrous ammonia or aqueous ammonia by the steam reforming of hydrocarbons | tonnes of ammonium phosphate | Calculated in accordance with section 37 of these Regulations | Part 29(e)granular urea in addition to producing anhydrous ammonia or aqueous ammonia by the steam reforming of hydrocarbons | Tonnes of granular urea | 0.159 | Part 29Food Processing30 | Industrial processing of potatoes for human or animal consumption | Tonnes of potatoes used as raw material | 0.102 | Part 3031 | Industrial processing of oilseeds for human or animal consumption | Tonnes of oilseed used as raw material | 0.0481 | Part 3132 | Production of ethanol from distillation for use in the production of alcoholic beverages | Kilolitres of absolute alcohol | 1.11 | Part 3233 | Processing of corn through wet milling | Tonnes of corn used as raw material | 0.0991 | Part 3334 | Production of citric acid | Tonnes of anhydrous citric acid | 0.479 | Part 3435 | Production of refined sugar from raw cane sugar | Tonnes of refined sugar | 0.102 | Part 3535.1 | Production of malt | Tonnes of malt | 0.117 | Part 35.1Pulp and Paper36 | Production of pulp and other products | | | (a)pulp from wood, other plant material or paper or any product derived directly from pulp or a pulping process — excluding specialty products — at a facility equipped with a recovery boiler, lime kiln or pulping digester | tonnes of finished product | 0.203 | Part 36(b)pulp from wood, other plant material or paper or any product derived directly from pulp or a pulping process — excluding specialty products and products referred to in subitem 39(3) — at a facility not equipped with a recovery boiler, lime kiln or pulping digester | tonnes of finished product | 0.184 | Part 36(c)production of specialty products from wood, other plant material or paper or any product derived directly from pulp or a pulping process, namely abrasive paper base, food grade grease resistant paper, packaging waxed paper base, paper for medical applications, napkin paper for commercial use, towel papers for commercial or domestic use, bath paper for domestic use, facial paper for domestic use or dissolving pulp for viscose | tonnes of specialty product | Calculated in accordance with section 37 of these Regulations | Part 36Automotive37 | Main assembly of four-wheeled self-propelled vehicles that are designed for use on highways and that have a gross vehicle weight rating of less than 4 536 kg (10,000 pounds), except vehicles capable of operating with no tailpipe emissions and equipped with a battery with a capacity of at least 15 kWh | Number of vehicles | 0.216 | Part 37Electricity Generation38 | Generation of electricity | | | (a)using solid fuels | gigawatt hours (GWh) | 800 in 2019650 in 2020622 in 2021594 in 2022566 in 2023538 in 2024510 in 2025482 in 2026454 in 2027426 in 2028398 in 2029370 in 2030 and after | Part 38(b)using liquid fuels | gigawatt hours (GWh) | 550 | Part 38(c)using gaseous fuels | gigawatt hours (GWh) | 370 | Part 38Wood Products39 | (1)Production of wood veneer or plywood | Cubic metres of wood veneer and plywood | 0.0701 | Part 39(2)Production of lumber | Cubic metres of lumber | 0.0229 | Part 39(3)Production of the following products:(a)particle board, excluding oriented strand board(b)low, medium or high density composite panels, composed primarily of cellulosic fibers and a bonding system, cured under heat and pressure, including hardboard | Cubic metres of particle board and of panels composed primarily of cellulosic fibers and a bonding system cured under heat and pressure, including hardboard | 0.0889 | Part 39Aluminium40 | Aluminium production from alumina | Tonnes of liquid aluminium | 1.58 | Part 4041 | Production of baked anodes for use in aluminium production from alumina | Tonnes of baked anodes | 0.328 | Part 4142 | Production of calcined petroleum coke for use in aluminium production from alumina | Tonnes of calcined petroleum coke | 0.486 | Part 4243 | Production of alumina from bauxite | Tonnes of alumina (Al2O3) equivalent | Calculated in accordance with section 37 of these Regulations | Part 43Rubber Products44 | Production of pneumatic tires, not including retreading and other forms of reconditioning | Tonnes of pneumatic tires | 0.225 | Part 44
Schedule 2 · Content of Annual Report on Emissions and Production (Subsection 11(1))
1#
2#
3#
3.1#
4#
5#
6#
7#
8#
8.1#
9#
10#
11#
12#
13#
14#
15#
16#
17#
Schedule 3 · Quantification Requirements (Paragraphs 17(2)(a) and (b), 20(2)(a), and 31(1)(a), subparagraph 31(1)(b)(i), subsection 32(1), paragraphs 34(1)(b) and (c) and Schedule 1)
1#
1#
1#
1#
2#
1#
1#
1#
1#
1#
1#
2#
3#
4#
1#
2#
3#
Schedule 4 · Information to Include in Application for Permit (Subsections 27(1) and 29(1))
1#
2#
3#
4#
5#
Schedule 5 · Content of Verification Report (Section 52 and subsection 53(1)(b))
1#
2#
3#
Item | Column 1 | Column 2 | Column 3 | Column 4 | Column 5Violator | Violation Type | Baseline Penalty Amount ($) | History of Non-compliance Amount ($) | Economic Gains Amount ($)1 | Individual | | | | (a)D | 400 | 1,200 | 400(b)E | 1,000 | 3,000 | 1,0002 | Other person | | | | (a)D | 2,000 | 6,000 | 2,000(b)E | 5,000 | 15,000 | 5,000
Schedule 5 · (Section 5, subsection 6(1) and section 8.1)
Item | Column 1 | Column 2 | Column 3 | Column 4 | Column 5Violator | Violation Type | Baseline Penalty Amount ($) | History of Non-compliance Amount ($) | Economic Gains Amount ($)1 | Individual | | | | (a)D | 400 | 1,200 | 400(b)E | 1,000 | 3,000 | 1,0002 | Other person | | | | (a)D | 2,000 | 6,000 | 2,000(b)E | 5,000 | 15,000 | 5,000
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.