Contents
- [Repealed, SOR/2009-317, s. 105]
- Short Title
- Interpretation
- Application
- Submission of Information
- Part I Approvals and Authorizations
- Part II Well, Pool and Field Evaluations
- Part III Operation of Wells
- Part IV Conservation Requirements
- Part V Production Rates
- Part VI Measurements and Testing
- Part VII Environmental Requirements
- Part VIII Operations
- Part IX Safety and Training of Personnel
- Part X Authorized Entry, Inspection and Investigations
- Part XI Records and Reporting
[Repealed, SOR/2009-317, s. 105]
Short Title
Interpretation
Application
Submission of Information
Part I · Approvals and Authorizations
General
Production Operations Authorization
Approvals
Evidence of Financial Responsibility
Part II · Well, Pool and Field Evaluations
Cores
Production Testing
Pool Pressure Measurements and Surveys
Cased Hole Logs
Fluid Sampling and Analysis
Part III · Operation of Wells
General
Well Operation Program Authorization
Approval for a Well Operation
Precautions
Well Operation Report
Abandonment or Suspension of a Zone or Well
Production Casing and Tubing
Fluids for Well Operations
Annulus Between Well Tubulars
Surface Controlled Subsurface Safety Valves
Wellhead and Christmas Tree Equipment
Emergency Shutdown Valves
Simultaneous Drilling and Production Operations
Part IV · Conservation Requirements
Reservoir Management
Voidage Replacement
Commingled Production
Flaring and Venting of Gas
Disposal of Oil
Part V · Production Rates
General
Part VI · Measurements and Testing
General
Prorated Production
Transfer Meters
Group Production Meters and Test Production Meter Calibration
Water Meter Calibration
Gas Meter Calibration
Condensate Measurement
Metering Records
Testing Frequency
Accuracy of Measurement
Part VII · Environmental Requirements
Physical Environmental Monitoring Equipment
Physical Environmental Observation and Reporting
Construction Disturbances
Hazards
Handling of Waste Material and Produced Water
De-commissioning
Part VIII · Operations
Safety Plan and Environmental Protection Plan
Equipment Requirements
Testing Requirements for Valves and Sensors
Maintenance and Replacement of Equipment
Support Craft
Standby Vessel
Support Craft Monitoring
Communications
Availability of Regulations
Suspension of Operations
Subsea Location
Part IX · Safety and Training of Personnel
General
Qualifications
Oil Spill Drills
Part X · Authorized Entry, Inspection and Investigations
Safety Zones
Conservation Officer and Safety Officer
Investigation of Accidents
Part XI · Records and Reporting
System of Units
Names and Designations
Change of Operator
Construction Progress
Daily Operating Record
Daily Production Record
Monthly Production Report
Submission of Data
Pilot Scheme
Annual Production Report and Annual Environmental Report
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.