Contents
- His Excellency the Governor General in Council, on the rec…
- 1 [Repealed, SOR/2016-130, s. 2]
- Interpretation
- Water Management Areas
- Application
- Water Use or Waste Deposit Without a Licence
- Applications for Licences
- Application Fees
- Licensing Criteria
- Water Use Fees
- Applications for Assignment
- Applications for Cancellation
- Security
- Public Register
- Reports
- Schedule I Water Management Areas (Section 3)
- Schedule II (Section 2)
- Schedule III Application for Licence, Amendment of Licence, or Renewal of Licence (Subsection 6(1))
- Schedule IV (Sections 5 and 8)
- Schedule V (Sections 5 and 8)
- Schedule VI (Sections 5 and 8)
- Schedule VII (Sections 5 and 8)
- Schedule VIII (Sections 5 and 8)
- Related provisions
His Excellency the Governor General in Council, on the recommendation of the Minister of Indian Affairs and Northern Development, the Treasury Board, the Northwest Territories Water Board and the Yukon Territory Water Board, is pleased hereby(a) pursuant to section 29 of the Northern Inland Waters Act, to revoke the Northern Inland Waters Regulations, C.R.C., c. 1234, and(b) pursuant to section 33 of the Northwest Territories Waters Act and section 33 of the Yukon Waters Act, to make the annexed Regulations respecting inland water resources in the Northwest Territories and the annexed Regulations respecting inland water resources in the Yukon Territory, in substitution therefor,notenoteeffective June 15, 1993.
Interpretation
2#
Water Management Areas
Application
Water Use or Waste Deposit Without a Licence
5#
Applications for Licences
6#
Application Fees
Licensing Criteria
8#
Water Use Fees
9#
Applications for Assignment
10#
Applications for Cancellation
11#
Security
12#
Public Register
14#
Reports
15#
Schedule I · Water Management Areas (Section 3)
1 Great Slave Lake and all waters and river basins draining into Great Slave Lake2 Great Bear Lake, all waters and river basins draining into Great Bear Lake, the Great Bear River and its tributaries and all the river basins of the Great Bear River and its tributaries3 The Mackenzie River, its tributaries and all river basins of the Mackenzie River and its tributaries4 and 5 [Repealed, SOR/2016-130, s. 13]6 All waters and river basins of the mainland draining into Hudson Bay7 All other waters and river basins draining into the Arctic Ocean or adjacent waters
Schedule II · (Section 2)
| Column I | Column IIItem | Type of Undertaking | Description of Undertaking1 | Industrial undertaking | Any industrial activity other than mining and milling, including manufacturing processes, hydrostatic testing, fluming, the exploration for, and production and transportation of oil and gas, cooling systems, food processing, tanneries, smelters, sawmills, pulp mills, metal finishing and tailings reprocessing2 | Mining and milling undertaking | Operation of a mine within the meaning of the Canada Mining Regulations or the Territorial Coal Regulations, and any milling related thereto3 | Municipal undertaking | Any activity(a)in a municipality, or in a settlement comprising a multiplicity of residential units, that uses only a municipal water and sewage system, including domestic, horticultural, fire protection, commercial or industrial activities, or(b)in a camp or lodge4 | Power undertaking | Authorized hydro or geothermal electrical generation of(a)Class 0 | 150 or fewer kilowatts(b)Class 1 | More than 150 kW but less than 5 000 kW(c)Class 2 | 5 000 or more kilowatts but less than 10 000 kW(d)Class 3 | 10 000 or more kilowatts but less than 20 000 kW(e)Class 4 | 20 000 or more kilowatts but less than 50 000 kW(f)Class 5 | 50 000 or more kilowatts but less than 100 000 kW(g)Class 6 | 100 000 or more kilowatts5 | Agricultural undertaking | Nourishing crops or the providing of water for livestock6 | Conservation undertaking | Construction of works for the preservation, protection or improvement of the existing natural environment7 | Recreational undertaking | A commercial or public recreational development8 | Miscellaneous undertaking | Any other undertaking
Schedule III · Application for Licence, Amendment of Licence, or Renewal of Licence (Subsection 6(1))
APPLICATION/LICENCE NO:(amendment or renewal only)1 NAME AND MAILING ADDRESS OF APPLICANTTELEPHONE: FAX: 2 ADDRESS OF HEAD OFFICE IN CANADA IF INCORPORATEDTELEPHONE:FAX:3 LOCATION OF UNDERTAKING (describe and attach a map, indicating watercourses and location of any proposed waste deposits)Latitude Longitude 4 DESCRIPTION OF UNDERTAKING (describe and attach plans)5 TYPE OF UNDERTAKING1 Industrial2 Mining and milling3 Municipal4 Power5 Agriculture6 Conservation7 Recreation8 Miscellaneous (describe) 8. 6 WATER USETo obtain water To cross a watercourse To modify the bed or bank of a watercourse Flood control To divert water To alter the flow of, or store, water Other (describe) 7 QUANTITY OF WATER INVOLVED (litres per second, litres per day or cubic metres per year, including both quantity to be used and quality to be returned to source)8 WASTE DEPOSITED (quantity, quality, treatment and disposal)9 OTHER PERSONS OR PROPERTIES AFFECTED BY THIS UNDERTAKING (give name, mailing address and location; attach list if necessary)10 PREDICTED ENVIRONMENTAL IMPACTS OF UNDERTAKING AND PROPOSED MITIGATION11 CONTRACTOR AND SUB-CONTRACTORS (names, addresses and functions)12 STUDIES UNDERTAKEN TO DATE (attach list if necessary)13 PROPOSED TIME SCHEDULEStart date Completion date NAME (Print)TITLE (Print)SIGNATUREDATEFor Office Use OnlyAPPLICATION FEE Amount: $ Receipt No.: WATER USE DEPOSIT Amount: $ Receipt No.:
Schedule IV · (Sections 5 and 8)
Item | Column I | Column II | Column III | Column IVWater Use/Deposit of Waste | Water Use and Deposit of Waste Permitted Without a Licence | Water Use and Deposit of Waste Requiring a Type “B” Licence | Water Use and Deposit of Waste Requiring a Type “A” Licence1 | Direct water use in respect of | | | (a)oil and gas exploration; and | Use of less than 100 m3 per day* | Use of 100 or more cubic metres per day* | None(b)any other industrial undertaking | Use of less than 100 m3 per day* | Use of 100 or more cubic metres per day and less than 300 cubic metres per day* | Use of 300 or more cubic metres per day*2 | (1) Watercourse crossings, including pipelines, bridges and roads | Construction of a structure across a watercourse less than 5 metres wide at ordinary high water mark at point of construction | Construction of a structure across a watercourse 5 or more metres wide at ordinary high water mark at point of construction | None(2) Watercourse training, including channel and bank alterations, culverts, spurs, erosion control, and artificial accretion | Training(a)of intermittent watercourses,(b)of watercourses that are less than 5 m wide at the ordinary high water mark at the point of training,(c)involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or(d)involving removal or placement of less than 100 m3 of material, where cross-sectional area not significantly changed at point of removal or placement | All other watercourse training | None(3) Flood Control | Construction of a temporary structure | Construction of a permanent in-stream structure | None(4) Diversions | Diversion of a watercourse that is less than 2 m wide at ordinary high water mark at point of diversion | All other diversions | None(5) Alteration of flow or storage by means of dams or dikes. | Off-stream storage of a quantity of water less than or equal to 2 500 m3 | Off-stream storage of a quantity of water greater than 2 500 m3 and less than 60 000 m3, or instream storage of a quantity of water less than 60 000 m3 | All other alterations or storage3 | Deposit of waste in conjunction with | | | (a)oil and gas exploration, | Deposit of drill waste by injection into an underground formation or reservoir that is authorized under paragraph 5(1)(b) of the Canada Oil and Gas Operations Act | Deposit of drill waste to a sump | Deposit of drill waste other than deposit of drill waste to a sump or by injection into an underground formation or reservoir(b)oil and gas production, processing and refining, | Deposit of drill waste by injection into an underground formation or reservoir that is authorized under paragraph 5(1)(b) of the Canada Oil and Gas Operations Act | None | Deposit of waste other than deposit of drill waste by injection into an underground formation or reservoir(c)quarrying and gravel washing, | Deposit of waste in conjunction with quarrying above ordinary high water mark where there is no direct or indirect deposit of waste to surface water | Deposit of waste in conjunction with quarrying below ordinary high water mark or deposit of waste in conjunction with quarrying above ordinary high water mark where there is a direct or indirect deposit of waste to surface water | None(d)hydrostatic testing, | Any deposit of waste associated with cleaning or testing of previously unused storage tanks or pipelines | Any deposit of waste associated with cleaning or testing of used storage tanks or pipelines | None(e)cooling, or | Any deposit of waste that does not contain biocides or conditioners | Any deposit of biocides or conditioners | None(f)other industrial undertakings | None | All | None
Schedule V · (Sections 5 and 8)
| Column I | Column II | Column III | Column IVItem | Water Use/Deposit of Waste | Water Use and Deposit of Waste Permitted Without a Licence | Water Use and Deposit of Waste Requiring a Type “B” Licence | Water Use and Deposit of Waste Requiring a Type “A” Licence1 | Direct water use | Use of less than 100 m3 per day* | Use of water for milling at a rate of less than 100 tonnes of ore per day, use of water for leaching other than production leaching or use of 100 or more cubic metres per day for undertakings other than milling or production leaching* | Use of water for milling at a rate of 100 or more tonnes of ore per day or use of water for production leaching2 | (1) Watercourse crossings, including pipelines, bridges and roads | Construction of a structure across a watercourse less than 5 metres wide at ordinary high water mark at point of construction | Construction of a structure across a watercourse 5 or more metres wide at ordinary high water mark at point of construction | None(2) Watercourse training including channel and bank alterations, culverts, spurs, erosion control, and artificial accretion | Training(a)of intermittent watercourses,(b)of watercourses that are less than 5 m wide at the ordinary high water mark at the point of training,(c)involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or(d)involving removal or placement of less than 100 m3 of material, where cross-sectional area not significantly changed at point of removal or placement | All other watercourse training | None(3) Flood Control | Construction of a temporary structure | Construction of a permanent in-stream structure | None(4) Diversions | Diversion of a watercourse that is less than 2 metres wide at ordinary high water mark at point of diversion | All other diversions | None(5) Alteration of flow or storage by means of dams or dikes | Off-stream storage of a quantity of water less than or equal to 2 500 m3 | Off-stream storage of a quantity of water greater than 2 500 m3 and less than 60 000 m3, or instream storage of a quantity of water less than 60 000 m3 | All other alterations or storage3 | Deposit of waste in conjunction with(a)placer mining, or | Any deposit of waste in conjunction with non-mechanized in-stream placer operations or with out-of-stream watercourse placer or testing operations, where no chemical additives are used and there is no direct or indirect deposit of waste to surface water | Any deposit of waste in conjunction with mechanized in-stream placer operations or with any operations where chemical additives are used | None(b)other mining and milling | Any deposit of waste, other than from milling, where there is no direct or indirect deposit to surface water | Any direct or indirect deposit of waste to surface waters, or any deposit of waste from milling at a rate of less than 100 tonnes of ore per day | Deposit of waste from milling at a rate of 100 tonnes or more of ore per day
Schedule VI · (Sections 5 and 8)
| Column I | Column II | Column III | Column IVItem | Water Use/Deposit of Waste | Water Use and Deposit of Waste Permitted Without a Licence | Water Use and Deposit of Waste Requiring a Type “B” Licence | Water Use and Deposit of Waste Requiring a Type “A” Licence1 | Direct water use | Use of less than 50 m3 per day* | Use of 50 or more cubic metres and less than 2,000 m3 per day* | Use of 2,000 or more cubic metres per day*2 | (1) Watercourse crossings, including pipelines, bridges and roads | Construction of a structure across a watercourse less than 5 m in width at ordinary high water mark at point of construction | Construction of a structure across a watercourse 5 or more metres in width at ordinary high water mark at point of construction | None(2) Watercourse training, including channel and bank alterations, culverts, spurs, erosion control, and artificial accretion | Training(a)of intermittent watercourses,(b)of watercourses that are less than 5 m wide at the ordinary high water mark at the point of training,(c)involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or(d)involving removal or placement of less than 100 m3 of material, where cross-sectional area not significantly changed at point of removal or placement | All other watercourse training | None(3) Flood control | Construction of a temporary structure | Construction of a permanent in-stream structure | None(4) Diversions | Diversion of a watercourse that is less than 2 m wide at ordinary high water mark at point of diversion | All other diversions | None(5) Alteration of flow or storage by means of dams or dikes | Off-stream storage of a quantity of water less than or equal to 2 500 m3 | Off-stream storage of a quantity of water greater than 2 500 m3 and less than 60 000 m3, or instream storage of a quantity of water less than 60 000 m3 | All other alterations or storage3 | Deposit of waste by(a)municipalities or settlements | Any deposit of waste in accordance with the Public Sewerage Systems Regulations of the Northwest Territories by a city, town, village or settlement serving 50 or fewer people where there is no direct or indirect deposit of waste to surface waters | Any deposit of waste by means of sewage collection or treatment system serving a population of between 50 and 2,000 | Any deposit of waste by means of a sewage collection or treatment system serving a population of 2,000 or more(b)camps or lodges | Any deposit of waste in accordance with the General Sanitation Regulations of the Northwest Territories by a camp or lodge serving 50 or fewer people, where there is no direct or indirect deposit to surface waters | Any deposit of waste by a camp or a lodge with capacity of more than 50 occupants per day or any direct or indirect deposit of waste to surface waters | None
Schedule VII · (Sections 5 and 8)
| Column I | Column II | Column III | Column IVItem | Water Use/Deposit of Waste | Water Use and Deposit of Waste Permitted Without a Licence | Water Use and Deposit of Waste Requiring a Type “B” Licence | Water Use and Deposit of Waste Requiring a Type “A” Licence1 | Direct water use | None | Class 0 | Classes 1 through 62 | (1) Watercourse crossings, including pipelines, bridges and roads | Construction of a structure across a watercourse less than 5 metres wide at ordinary high water mark at point of construction | Construction of a structure across a watercourse 5 or more metres wide at ordinary high water mark at point of construction | None(2) Watercourse training including channel and bank alterations, culverts, spurs, erosion control, and artificial accretion | Training(a)of intermittent watercourses,(b)of watercourses that are less than 5 m wide at the ordinary high water mark at the point of training,(c)involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or(d)involving removal or placement of less than 100 m3 of material, where cross-sectional area not significantly changed at point of removal or placement | All other watercourse training | None(3) Flood Control | Construction of a temporary structure | Construction of any permanent in-stream structure | None(4) Diversions | Diversion of a watercourse that is less than 2 metres wide at ordinary high water mark at point of diversion | All other diversions | None(5) Alteration of flow or storage by means of dams or dikes | Off-stream storage of a quantity of water less than or equal to 2 500 m3 | Off-stream storage of a quantity of water greater than 2 500 m3 and less than 60 000 m3, or instream storage of a quantity of water less than 60 000 m3 | All other alterations of flow or storage
Schedule VIII · (Sections 5 and 8)
| Column I | Column II | Column III | Column IVItem | Water Use/Deposit of Waste | Water Use and Deposit of Waste Permitted Without a Licence | Water Use and Deposit of Waste Requiring a Type “B” Licence | Water Use and Deposit of Waste Requiring a Type “A” Licence1 | Direct water use | Use of less than 100 m3 per day or use for construction of an ice bridge where the water used is removed directly from the watercourse* | Use of 100 or more cubic metres per day and less than 300 m3 per day* | Use of 300 or more cubic metres per day*2 | (1) Watercourse crossings, including pipelines, bridges and roads | Construction of a structure across a watercourse that is less than 5 metres wide at ordinary high water mark at point of construction | Construction of a structure across a watercourse that is 5 metres or more in width at ordinary high water mark at point of construction | None(2) Watercourse training including channel and bank alterations, spurs, culverts, erosion control, and artificial accretion | Training(a)of intermittent watercourses,(b)of watercourses that are less than 5 m wide at the ordinary high water mark at the point of training,(c)involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or(d)involving removal or placement of less than 100 m3 of material, where cross-sectional area not significantly changed at point of removal or placement | All other watercourse training | None(3) Flood Control | Construction of a temporary structure | Construction of a permanent in-stream structure | None(4) Diversions | Diversion of a watercourse that is less than 2 metres wide at ordinary high water mark at point of diversion | All other diversions | None(5) Alteration of flow or storage by means of dams or dikes | Off-stream storage of a quantity less than or equal to 2 500 m3 | Off-stream storage of a quantity of water greater than 2 500 m3 and less than 60 000 m3 or instream storage of a quantity of water less than 60 000 m3 | All other alterations of flow or storage3 | Deposit of waste | Any deposit of waste where there is no direct or indirect deposit to surface water | All other deposits of waste | None
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.