Contents
- Short Title
- Interpretation
- Application
- Submission of Information
- Part I General
- Part II Approval to Drill, Approval to Re-enter or Approval to Drill a Test Hole
- Part III Authorized Entry, Inspection and Investigations
- Part IV Drilling of a Well
- Part V Safety and Training of Personnel
- Part VI Operational Records and Reports
- Part VII Well Evaluation
- Part VIII Well Termination
- Part IX Deposition of Samples from a Well
- Part X Final Well Reports
- Part XI [Repealed, SOR/96-116, s. 41]
- Part XII Offences
Short Title
Interpretation
Application
Submission of Information
Part I · General
Application for Authorization
Conditions of Drilling Program Authorization
Defective or Experimental Equipment
Support Craft
Standby Craft
Hazards
Requirements for Drilling Units
Standards For Drilling Equipment
Meteorological Forecasts
Electrical Equipment
Small Drilling and Service Rigs
Diving Operations
Blowout Preventer Requirements
Casing
Cementation of Casing
Marine Riser
Drilling Fluid System
Air, Foam and Gas Drilling
Testing Equipment
Manuals
Contingency Plans
Part II · Approval to Drill, Approval to Re-enter or Approval to Drill a Test Hole
Prohibition
Notification
Granting, Suspension and Revocation of Approvals
Surface Improvements
Location of Well
Well Prognosis
Evidence of Financial Responsibility
Part III · Authorized Entry, Inspection and Investigations
Conservation Officers and Safety Officers
Investigation of Accidents
Part IV · Drilling of a Well
Safety Zone
Availability of Regulations
Display of Authorizations, Approvals and Critical Procedures
Surveys
Well Control Equipment
Safety Valves
Choke Manifold
Flow Lines from Wells
Flare Line and Flare Pit
Protection of Permafrost
Pressure Tests of Casing and Preventers
Coal and Mineral Deposits
Cementation
Waiting on Cement Time
Maximum Pressure During Well Stimulation
Formation Leak-Off Test
Monitoring of Drilling
Volume of Drilling Fluid
Pressure Transition Zone
Directional and Deviation Surveys
Plugging Back of Wells
Drilling Unsafe to Continue
Inspections and Tests of Equipment
Inspection of Electrical Equipment
Quantities of Consumables
Bulk Handling of Fuel and Consumables
Waste Material
Radio and Support Craft Procedures
Moving Drilling Units
Anchors
Stability
Part V · Safety and Training of Personnel
General
General Safety
Training of Personnel
Safety Drills
152. and 153#
[Repealed, SOR/96-116, s. 31] (repealed)
Safety Instruction
Rest Period
156. and 157#
[Repealed, SOR/96-116, s. 32] (repealed)
Smoking
159. to 163#
[Repealed, SOR/96-116, s. 33] (repealed)
Radioactive Substances
166. to 168#
[Repealed, SOR/96-116, s. 34] (repealed)
Part VI · Operational Records and Reports
General
Safety and Well Evaluation Information
Reference for Well Depths
Notification of Significant Event
Notifications to Conservation Engineer
Submission of Survey Plan
Tour Sheets and Barge Reports
Daily Records
Routine Reports
Downhole Survey Record
Penetration and Gas Content Records
Formation Flow Records
Report of Structural Faults
Well Termination Report
Press Releases
Part VII · Well Evaluation
General
Drill Cuttings
Cores
Gas Content of Drilling Fluid
Wireline Logs
Testing and Sampling of Formations
Formation Flow Test
Part VIII · Well Termination
Application
Removal of Casing
Surface Marking and Restoration
Drilling Rig Removal Prohibited
Operator Responsible for Abandoned Wells
Location of Abandonment Plugs
Length and Quality of Cement Plugs
Feeling for Plugs
Termination of Test Holes
Marking of Well-heads
Fluid in Abandoned or Suspended Wells
Suspended Wells
Well Completion
Part IX · Deposition of Samples from a Well
General
Drill Cuttings
Sidewall Cores
Conventional Cores
Analysis of Fluid Samples
Delivery of Samples and Other Materials to Chief
Part X · Final Well Reports
Exploratory and Development Wells
Test Holes
Part XI · [Repealed, SOR/96-116, s. 41]
Part XII · Offences
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.