Part II · Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia · GlobalLawDB
Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia
Foothills shall, when requested by the designated officer, submit to him site-specific data satisfactory to him on the hydrological or geotechnical conditions at any place where the pipeline crosses any waterbody.
(a)inspect every pipeline water crossing for evidence of deterioration in bank stability and stream bed condition, and
(b)when directed by the designated officer, monitor the consequences of any pipeline water crossing
in such manner as is satisfactory to the designated officer.
(2)Foothills shall report to the designated officer, within a reasonable period of time, the results of the inspection referred to in paragraph (1)(a) and, when required by the designated officer, the results of the monitoring referred to in paragraph (1)(b).
Where the designated officer is of the opinion that remedial measures are necessary at a pipeline water crossing, Foothills shall take such remedial measures as are satisfactory to the designated officer.
(a)in respect of every waterbody referred to in the list required to be submitted pursuant to section 70 in respect of the threatened existence of wildlife, and
(b)in respect of every waterbody containing a fish habitat area referred to in the list required to be submitted pursuant to subsection 76(1),
in which groundwater contributes significantly to winterflow in or under the bed of that waterbody, take such measures as are satisfactory to the designated officer to maintain adequate winter groundwater and channel flow in such waterbody.
Where the natural action of a stream will not restore the bed of such stream to its original shape and extent after the completion of construction, Foothills shall, unless otherwise directed by the designated officer, take measures to restore the stream to its original shape and extent by using the original material of the stream bed or other material of equivalent stability.
Federal laws of Canada reproduced under the Reproduction of Federal Law Order (SI/97-5); not the official version. Source: Justice Laws Website.